Grid monitors · Sumatra · G.02
PLN Sumatra interconnected grid and the Batam island system
The Sumatra 275/150 kV system, a north-south backbone from Aceh through Medan, Pekanbaru and Palembang to Lampung, plus the separate Batam-Bintan (Barelang) island grid run by PLN Batam, where Medco Power operates the Panaran gas plants.
Snapshot · coordinates approximate; not an operational topology · as of 26 Jun 2026 · RUPTL 2025–2034; PLN AR 2024; public sources · data 2026-06-26
DC Solutions → Java-Bali grid → Sumatra grid
01 Grid map
Click the map to enable scroll zoom; click a mark for its rating, operator and confidence.
275 kV backbone150 kVBatam island (separate grid)SubstationPlantData center
02 What the dataset holds
Batam is islanded. The Batam-Bintan-Rempang-Galang (Barelang) 150 kV grid is not synchronously tied to the mainland Sumatra interconnection — it is its own system run by b'right PLN Batam, with Medco Power's Panaran gas plants and PLTU Tanjung Kasam as base-load, and the Nongsa Digital Park subsea-cable DC hub, a Singapore-adjacent AI/edge load.
03 Substation and plant atlas
Sorted by province. Capacity is MW for plants and MVA for substations.
| Node | Type | kV | Capacity | Region | Notes |
|---|
04 / Reference
Read further
Technical manual and methodologyJava-Bali grid monitorThe dataset (JavaScript, with sources)