Primary CHW Header engine-bound
Evaporator Duty
UNAVAILABLE
CHW Flow Reconciliation engine
943.0 L/s is the engine's IT sensible-load reference. Current evaporator duty requires 982.3 L/s at the same ΔT; measured header flow remains unavailable.
Operator Controls
Authority UNAVAILABLE
Alarm Summary
Status UNAVAILABLE
First-out: UNAVAILABLE
Ack: UNAVAILABLE