Data center construction cost by system, tier and region
Total CAPEX and its split by system — electrical, cooling, building, UPS, generators, fire, BMS, network and the rest — from IT load, rack density, cooling, redundancy, building type, seismic zone and region. RZEngine computes it in your browser; every figure follows the inputs.
engine RZEngine capex.detailed · basis Turner & Townsend, JLL, CBRE cost benchmarks, Uptime Tier I–IV · updated 2026-10
DC Solutions → Calculator → CAPEX
Results
total = Σ system cost + soft costs + contingencyHeadline
Per kW, tier and energy
Cost by system
Full analysis — rack count, white space, build schedule, $/kW benchmark, sustainability, scenario comparison and the PDF report
02 / Reference
Method
- System cost
C_i = f_i ($/kW) · P_IT · M_location · M_i - M_electrical
M_redundancy · M_rack · M_distribution · M_transformer - M_cooling
M_cooling type · M_rack - M_generator
M_redundancy · (1 + 0.008 · (h_fuel − 24)) · M_fuel type - M_location
region factor, or city $/W ÷ 4.65 $/W - Contingency
(Σ C_i + design + PM) · 5 % simple, slider in advanced (10 % default) - Total
Σ C_i + design + PM + contingency + front-of-meter + renewables - Energy cost
P_IT · PUE(cooling, rack) · 8,760 h · tariff - Cost per kW
total / P_IT
Computed against
Turner & Townsend Data Centre Cost IndexJLL Data Center OutlookCBRE data center benchmarksUptime Institute Tier I–IVASHRAE 34 refrigerant safety
Read further
Technical manual and methodologyGlossaryOPEX calculatorTCO calculatorPUE calculatorDC SolutionsMy account and saved scenarios
Estimates for education and planning, built from public industry benchmarks. Not a basis for investment, procurement or engineering decisions; confirm site-specific figures with a qualified engineer. Runs in your browser; nothing is sent to a server. Independent research; not affiliated with any current or former employer. Privacy · Terms.