Provincial Headlines
PLN Distribution UID Jateng + DIY estimates, 2024 baseline. Renewable share is the highest in Java thanks to Tanjung Jati B coal/biomass co-firing, Mrica hydro, and the Dieng geothermal complex.
DC Operators & Industrial Intakes · 20 kV Feeder Detail
Operator-level detail of the 20 kV feeder overlay. Capacity expressed as IT load (MW) for DC sites and aggregate intake (MW) for industrial estates. Confidence reflects how directly the address is sourced (high → press release / regulatory; medium → operator website; low → estate centroid).
| Site | Type | Capacity | Feed Substation | Notes |
|---|
Provincial Anchors
500 kV substations and major power plants drawn from the provincial filter of the base data file. Tanjung Jati B (Jepara) is the largest single coal asset on Java; Mrica + Dieng anchor the renewable mix.
Major Plants (sorted by capacity)
500 kV Substations
150 kV Substations
Sibling Provinces
Continue the drill-down to the neighbouring nodes on the Java-Bali backbone — Jakarta + Banten (load centre), Jawa Barat (hydro/geothermal heartland), and Jawa Timur (eastern industrial belt).
Jakarta + Banten — Load Centre
Highest-density node on Java-Bali with 18+ data-centre operators across DCI, NTT, BDx, Equinix, PDG, GDS, EdgeConneX. Peak ~11.5 GW.
Jawa Barat — Hydro + Geothermal
Anchored by 1.0 GW Cirata reservoir and the Wayang Windu / Patuha geothermal complex. Sentul + Karawang + Bandung DC clusters. Peak ~8.2 GW.
Jawa Timur — Eastern Industrial Belt
Paiton complex (4.7 GW coal) plus Gresik gas anchor the eastern Java backbone. Surabaya and Sidoarjo industrial estates plus emerging DC operators on the Madura corridor.
Footnote: Tanjung Jati B (Jepara) injects directly into the 500 kV Tanjung Jati - Ungaran corridor and is co-fired with biomass under the PLN co-firing programme; the renewable share reflects that mix plus Mrica cascade hydro and the Dieng geothermal field. Industrial intakes shown for Kendal SEZ, Batang KITB, Semarang, and Cilacap are sourced from PLN UID Jateng + DIY feeder maps where the overlay file is unavailable; capacities default to the estate centroid until the parallel overlay file lands.