Global Data Center
Market Tracker

Capacity, construction pipeline, and growth projections across 25+ markets worldwide

122.2 GW
Global Installed Capacity
Source: Synergy Research, Q1 2025
7.5 GW
Under Construction, N. America primary markets
Source: CBRE, H1 2026
+57%
Data Center CAPEX Growth 2025
Source: Dell'Oro Group, Mar 2026
1,360
Hyperscale Facilities, end 2025
Source: Synergy Research, 2026
14% CAGR
Capacity Growth 2025-2030
Source: ABI Research
FULL ACCESS
All calculations run locally. No data transmitted.
Data —
25 major markets tracked
Broker reports
Interactive Market Map
Click a market bubble to explore capacity, vacancy, pricing, and growth data. Bubble size indicates operational capacity.
Established (>500 MW)
Growing (100-500 MW)
Emerging (<100 MW)
Bubble size = operational capacity
Region
Maturity
Sort
Full Market Data
Click column headers to sort. All capacity figures in MW.
Market Region Operational (MW) Construction (MW) Planned (MW) Vacancy % Colo $/kW/mo Power $/kWh CAGR Maturity
Regional Capacity Summary
Total capacity by region: operational, under construction, and planned pipeline.
Advanced Analytics
FULL
UNLOCK
Monte Carlo Market Size Forecast
--
P5 (GW)
--
P50 (GW)
--
P95 (GW)
5-Year Regional Growth Projection
--
Fastest Region
--
Total MW Added
Sensitivity Tornado
Strategic Narrative & Investment Thesis
Sign in for the full analysis for Monte Carlo forecasts, 5-year projections, tornado analysis & strategic narrative
Disclaimer & Data Sources

This dashboard is provided for educational and estimation purposes only. Data represents Q1 2025 estimates compiled from public industry reports and should not be used as the sole basis for investment decisions. Always consult qualified professionals for site-specific analysis.

Data sources: Synergy Research Group, CBRE Data Center Solutions, Dell'Oro Group, ABI Research, JLL Data Center Outlook, Cushman & Wakefield, individual market reports.

All calculations are performed entirely in your browser. No data is transmitted to any server. See our Privacy Policy for details.

By using this tool you agree to our Terms. All content on ResistanceZero is independent personal research. This site does not represent any current or former employer.

References

[1]
CBRE. (2025). Global Data Centre Market Report 2025.
Cross-region capacity, vacancy, rental and pipeline data; primary source for headline market figures.
[2]
JLL. (2025). Global Data Center Outlook H2 2025.
Construction pipeline, hyperscale share, regional rent benchmarks.
[3]
Cushman & Wakefield. (2025). Global Data Center Market Comparison 2025.
Liquidity, regulatory and connectivity scoring across 55+ markets.
[4]
Synergy Research Group. (2024). Hyperscale Data Center Capacity 2024.
Hyperscaler MW capacity by region, used to validate self-build vs colocation splits.
[5]
Uptime Institute. (2024). Global Data Center Survey 2024.
Tier-distribution, PUE, sustainability and outage data referenced across the tracker.
[6]
IEA. (2024). Electricity 2024 — Data Centre Demand.
DC electricity consumption baseline (~460 TWh in 2022, projected 1,000 TWh by 2026).
[7]
McKinsey. The Cost of Compute: $6.7T DC Buildout.
Cumulative global DC capital investment projection through 2030.
[8]
BloombergNEF. BloombergNEF Data Center Power Demand Forecast.
Independent power demand and renewable PPA tracking by region.
[9]
Data Center Frontier. Data Center Frontier — Market Reports & Analysis.
Industry trade reporting cross-checked against utility filings and DC operator releases.
[10]
Government / utility filings — including PJM Interconnection 2024 LTRA, Singapore IMDA Green DC Roadmap, ERCOT capacity reports, and Dominion Energy IRP for the Northern Virginia cluster. Used as primary source for region-specific power and capacity numbers.
[11]
CBRE. (2026). North America Data Center Trends H1 2026.
Operational inventory, under-construction MW and vacancy for Northern Virginia, Dallas, Phoenix, Chicago and Silicon Valley; 7,481 MW under construction across primary markets.
[12]
Cushman & Wakefield. (2026). Global Data Center Market Comparison H1 2026, per-market figures as published on datacentres.com.
Operational and under-construction MW and colocation vacancy for the EMEA, APAC and Latin American markets. Operational MW counts hyperscale self-build plus colocation.
[13]
Dell’Oro Group. (2026, March 17). Data Center Capex Surges 57 Percent in 2025 as AI Deployments Accelerate.
Year-over-year data center capex growth, 2025.
[14]
Synergy Research Group. (2026). Hyperscale Operators to Account for 67% of all Data Center Capacity by 2031.
1,360 hyperscale data centers operating at the end of Q4 2025.

Tracker figures are aggregates from publicly available reports; for educational and research purposes only. Last refresh: 2026-10 (market figures as of H1 2026). Terms · Glossary

Restricted Access

This module is available to root accounts only. Please sign in with an authorized account to continue.