Jawa Barat System Headlines
Province-level estimates. Reserve margin reflects PLN AR 2024 surplus on Java-Bali allocated to Jabar by load. Renewable share is the highest on Java thanks to Citarum hydro plus the Bandung-Garut geothermal belt.
DC Operators & Industrial Intakes
Endpoints of the 20 kV overlay. Feed substation refers to the upstream 150 kV GI on the Jabar ring; injected intermediates (Karawang Timur, Purwakarta, Bandung Timur, Cirebon Industrial) are flagged where the base PLN dataset does not list them.
| Site | Type | Capacity (MW) | Feed Substation | Notes |
|---|
Major Plants & Substations
Hydro and geothermal anchors plus the headline coal block at Cirebon and Indramayu, alongside the 500 kV ring substations that loop power into the Jabar 150 kV system.
| Plant | Fuel | Capacity |
|---|---|---|
| Cirata | HYDRO | 1,008 MW |
| Saguling | HYDRO | 700 MW |
| Jatiluhur | HYDRO | 187 MW |
| PLTU Cirebon-1 | COAL | 660 MW |
| PLTU Cirebon-2 | COAL | 1,000 MW |
| PLTU Indramayu | COAL | 990 MW |
| Wayang Windu | GEO | 227 MW |
| Salak | GEO | 377 MW |
| Darajat | GEO | 270 MW |
| Patuha | GEO | 55 MW |
| Kamojang | GEO | 235 MW |
| Substation | Voltage | MVA |
|---|
Sibling Province
The Cikarang ↔ Karawang corridor is operationally contiguous with the Jakarta-Banten 150 kV ring. DCI JK4/JK5 in Karawang Timur are listed there; this page picks up the Karawang Timur, Purwakarta, Bandung and Cirebon clusters.
DKI Jakarta + Banten
Highest-density node on the Java-Bali grid. Coastal coal + city-edge gas with 18 known DC operators, peak load ~11.5 GW. The 20 kV overlay covers DCI, NTT, BDx, Equinix, Princeton and GDS plus the Cikarang industrial belt.
- Peak ~11.5 GW · 25% reserve margin
- 18 known data-centre operators
- 20 kV feeder overlay (~40 endpoints)
Confidence levels on individual rows: high = official filing or operator press release with explicit address, medium = operator website lists area and was geocoded to estate centroid, low = inferred from peering or sales material with placement at industrial-estate centroid. The 20 kV layer is curated for visualization, not a complete distribution map. Generation mix percentages are PLN AR 2024 estimates and may vary year-to-year with hydrology and geothermal availability.