Google Cloud europe-west2-b Power Loss: PLC Logic Stops Generator Start
Summary
On 20 Oct 2026 a utility cable fault took out the only live feed to the UK facility hosting Google Cloud zone europe-west2-b, which was on a single feed during maintenance. The PLCs read live voltage on the line side of the open second feeder, so they never started the generators. The UPS ran out after about five minutes and the zone went dark for about 80 minutes; majority recovery took 6 hours 8 minutes.
- Users affected
- Google Cloud customers with workloads in europe-west2-b lost them for the outage; customers elsewhere in europe-west2 saw latency and errors during failover. No customer count is given.
- Duration
- 6h 8m — Zone lost power 07:00 BST 20 Oct → majority workload recovery 13:08 BST (6 h 8 min)
- Financial
- Not disclosed
- Scope
- Zonal outage (one facility) with regional degradation
- Site
- Facility hosting zone europe-west2-b · Site not named, United Kingdom, europe-west2-b
- Services down
- Compute Engine and Persistent Disk (zonal), Google Kubernetes Engine, Cloud SQL, BigQuery, Looker, AlloyDB, Memorystore, Apigee
How the defences failed
One availability zone went fully dark and the rest of europe-west2 degraded during failover (40 services listed, no impact outside the region). Duration (5): the main impact lasted 6 h 8 min, inside the 4–12 h band. No cost or customer count is disclosed, so financial and users are judged moderate.
All 10 impact metrics
| UPS autonomy (rated) | about 5 minutes |
| Utility loss to zone power loss | 7 minutes (06:53 → 07:00 BST) |
| Zone without power | 07:00 → 08:20 BST data-hall power, about 80 minutes; standby source restored at 07:54 |
| Main impact resolved | 6 hours 8 minutes (07:00 → 13:08 BST) |
| Compute Engine health at majority recovery | 99.5% of VMs operational at 13:08 BST |
| GKE incident duration | 7 hours 34 minutes (07:02 → 14:37 BST) |
| BigQuery disruption in europe-west2 | about 5 hours 9 minutes (07:03 → 12:12 BST) |
| Looker instances unresponsive at peak | about 45% |
| Services listed as impacted | 40 Google Cloud services, all within europe-west2 |
| Days in single-feed posture before the event | 6 (feeder B opened after the 14 Oct load test; outage 20 Oct) |
Sequence of events
- TRIGGER A quarterly generator load test finds issues on the B feeder pathway. Circuit breaker feeder B is opened for corrective repairs, leaving the site in a temporary single-feed (1N) bridged maintenance posture on primary utility feed A.
- TRIGGER The primary utility provider experienced an outage on primary utility feed A, caused by an underground cable fault on the utility network outside the facility.Utility / grid operator
- TRIGGER Both master PLCs read live voltage from feed B on the line side of its open breaker, treat the utility as healthy, and did not issue a start command to the generator plant.
- MITIGATION Static UPS battery banks carry the critical load as designed; their rated autonomy is about five minutes.
- MITIGATION The onsite facilities team attempted to execute a remote load transfer via the PLC; the PLC inhibited it because of the live upstream voltage reading on feed B.Authorised electrical person
- IMPACT The batteries are exhausted. Host servers, local storage and network aggregation hardware in europe-west2-b lose power; instances, database replicas and worker nodes in the zone become unreachable.
- IMPACT Google Kubernetes Engine impact begins: zonal clusters in europe-west2-b go fully unavailable and regional clusters lose their worker nodes in the zone.
- DETECTION Google engineers were alerted to the disruption via automated monitoring systems and probers showing elevated API error ratios, job submission timeouts and loss of reachability in the zone.Operations lead
- CASCADE Automated failover moves work to adjacent zones. Cross-zone calls to metadata in the dark zone time out, and the redirected load saturates the surviving zones, giving queueing, slow database failovers and intermittent 500 and 503 errors across europe-west2.
- MITIGATION Engineers isolated the offline availability zone by routing regional services away from it, and reprioritised scheduler capacity in the surviving zones toward active customer reservations.Service recovery lead
- RECOVERY The facility team transferred the facility load to the standby utility source; power from the standby source is restored and re-energisation of the data halls begins.Authorised electrical person
- RECOVERY Utility power is re-established to the data halls. Site teams and OEM vendors reconfigured and validated PLC functionality on both undervoltage and breaker status, and the generator automation controllers are reset and tested.Vendor / upstream provider
- RECOVERY Cluster managers start rescheduling compute jobs and network devices come back online.
- RECOVERY Storage devices that shut down uncleanly start recovery. Responders chose not to restore services that would otherwise make this worse, which lengthens the outage to protect data.Service recovery lead
- RECOVERY Power redundancy is verified and storage is far enough recovered to prepare controlled traffic re-admission.
- RECOVERY Engineers begin gradual, controlled traffic re-admission to europe-west2-b so accumulated job backlogs drain without a second surge.
- RECOVERY Compute Engine VMs and zonal disks in the zone come back online; regional services and compute management are fully undrained by 12:29 BST.
- RESTORED Majority workload recovery: Compute Engine VMs are 99.5% operational and new VM creation is fully supported.
- RESTORED After a tail of isolated workloads recovers, the closure notification for the incident was posted on the status page.Communications lead
Response by role
What each role did
Roles the sequence of events shows acting; every entry quotes its source line. Select a time to jump to it.
Role by role
Recorded actions / playbook actions per role. A role with 0 recorded actions does not appear in the sources.
The primary utility provider for feeds A and B, not named — External owner of the supply: switching at the substation, load shedding, restoration.
On the record
- Lost primary feed A to an underground cable fault outside the facility
experienced an outage on primary utility feed A
Playbook analyst guidance by failure mode, not a record of what happened
- FM-04Notify the site of a feed loss and its expected durationNFPA 110Correction of errors #1
- FM-02Coordinate switching to the standby source with the site when the active feed failsNFPA 110Correction of errors #3
- FM-04Repair and test the faulted cable, then restore the feed in coordinated switching with the siteEN 50110-1Correction of errors #2
The onsite facilities team, not named — Switching, isolation and lock-out of power sources, and safe re-energisation.
On the record
- Tried a remote load transfer through the PLC, which blocked it
attempted to execute a remote load transfer via the PLC
- Moved the site to the standby utility source and began re-energising the halls
transferred the facility load to the standby utility source
Playbook analyst guidance by failure mode, not a record of what happened
- FM-01Interlock generator-start logic with breaker position as well as undervoltage on every feeder, and prove it in each maintenance line-upNFPA 110Correction of errors #6
- FM-02While one feeder is out, watch the remaining feed and generator readiness continuously and alarm on any deviationUptime OSContributing factor #1
- FM-01If the PLC blocks transfer, start generators or switch to the standby source by the rehearsed manual procedureNFPA 110Correction of errors #9
- FM-03Execute the rehearsed transfer to the standby source within the UPS windowNFPA 110Correction of errors #9
- FM-04Confirm the site has transferred to generators or another source and stays there until the feed is repairedNFPA 110Correction of errors #2
- FM-02Return to the full A and B line-up under a written method of procedure, then repeat the generator transfer testEN 50110-1Correction of errors #5
The facility vendor and OEM vendors who reconfigured the PLC, not named — Third party whose product, service or network sits in the failure path.
On the record
- Reconfigured the PLC with the site team to check breaker status as well as voltage
reconfigured and validated PLC functionality
Playbook analyst guidance by failure mode, not a record of what happened
- FM-01Review PLC start logic against multiple simultaneous failures before the next transfer testNFPA 110Correction of errors #7
On-shift facility staff who saw the UPS go on battery, not named in the record — Meets the first alarm: on-shift technician or security in a facility, on-call engineer in a service.
On the record
No action by this role appears in the sources.
Playbook analyst guidance by failure mode, not a record of what happened
No incident commander is named in the record — Owns every decision until formally relieved: site duty manager on scene, or the declared IC of a service incident.
On the record
No action by this role appears in the sources.
Playbook analyst guidance by failure mode, not a record of what happened
- FM-03Own the go or no-go on manual switching so the team does not wait on remote commandsNIMS / ICSLesson #4
Google engineering teams alerted by monitoring — Technical lead who diagnoses and drives the fix; the subject-matter expert at the keyboard or the switchboard.
On the record
- Were paged by monitoring and probers four minutes after impact
alerted to the disruption via automated monitoring systems and probers
Playbook analyst guidance by failure mode, not a record of what happened
- FM-02Treat every reduced utility posture as a change: review it and test the automatic transfer in that line-up before leaving the site in itChange managementCorrection of errors #12
- FM-05Alert on zone reachability and cross-zone timeout rates together so a zonal loss is declared within minutesSRE incident mgmtLesson #6
- FM-01Restore storage integrity before re-admitting traffic after a hard power lossNIST SP 800-34Lesson #5
Google engineers restoring storage, compute and traffic — Restores customer service: failover, workload moves, capacity, backlog drain.
On the record
- Routed regional services away from the dark zone and reprioritised capacity
isolated the offline availability zone
- Held services back while storage recovered from the unclean shutdown
chose not to restore services that would otherwise make this worse
Playbook analyst guidance by failure mode, not a record of what happened
- FM-05Route regional services away from the dark zone and protect capacity for active reservationsSRE incident mgmtContributing factor #6
Google Cloud Service Health status page — Status page, customer notices, regulators and press; one voice, timed updates.
On the record
- Posted the closure notice on Service Health at 15:03 BST
the closure notification for the incident was posted
Playbook analyst guidance by failure mode, not a record of what happened
- FM-04Post a location-specific status update as soon as a facility-level event is confirmedSRE incident mgmtCorrection of errors #13
Google Cloud customers running workloads in europe-west2 — The tenant or service user: their own redundancy, backups and continuity plan.
On the record
No action by this role appears in the sources.
Playbook analyst guidance by failure mode, not a record of what happened
- FM-05Keep cross-zone failover tested with capacity reserved in the other zonesISO 22301Lesson #6
Failure mode & effects analysis (FMEA)
The power chain of the UK facility hosting europe-west2-b (utility feeds A and B, standby utility, dual master PLCs and generator start logic, static UPS) and Google Cloud's zonal failover and storage recovery. Analysed from Google's final incident report, which is the operator's own account; the facility operator and equipment makes are not named.
- Caught only after impactD ≥ 8
- 1 of 5
- Actions that cut occurrenceO lowered
- 4
- Actions that cut detectionD lowered
- 2
- Actions that cut severityblast radius unchanged
- 0
FM-01 The start permissive reads live line-side voltage on open feeder B and decides a healthy source exists, so no generator start is commandedGenerator start logic in the dual master PLCs 9·4·9 324 72
- Function
- Start, synchronise and connect the generator plant when the critical load loses utility supply
- Effect
- The generators never start; the UPS carries the load until its batteries are exhausted and the data halls lose power
- Cause
- Undervoltage sensing wired upstream of the feeder breakers and logic that does not check breaker position, identical in both PLCs
- Prevention in place
- Dual-redundant master PLCs; quarterly generator load tests
- Detection in place
- None that flagged the logic; it surfaced only when feed A failed in the 1N posture
- S 9
- It takes a whole facility, a full availability zone, off power: the rubric's 9. Not 10, because no hazard to people and no loss of the facility or of several regions is recorded.
- O 4
- It needs a feeder breaker open while that feeder stays live upstream, plus loss of the other feed: an uncommon line-up, so 'infrequent'.
- D 9
- The defect was latent through commissioning and routine load testing and was found only by the outage itself.
Corrective action
- PLC reconfigured and validated on undervoltage and breaker status (Google, completed) Correction of errors #6
- Generator load-transfer tests proving automatic start within the battery timer (Google, completed) Correction of errors #4
- PLC code review against multiple failure scenarios (Google, committed) Correction of errors #7
- PLC code review inside commissioning before Facility Ready (Google, committed) Correction of errors #11
After action: S9 · O2 · D4 → RPN 72. Severity is unchanged: the same failure would still darken the zone. Occurrence falls because the logic now checks breaker status, and detection improves because load tests now prove the automatic start. The code reviews are committed, not yet confirmed done, so the lower scores are a claim about those actions.
Who acts — playbook
- Authorised electrical person Interlock generator-start logic with breaker position as well as undervoltage on every feeder, and prove it in each maintenance line-upNFPA 110Correction of errors #6
- Vendor / upstream provider Review PLC start logic against multiple simultaneous failures before the next transfer testNFPA 110Correction of errors #7
- First responder On loss of a utility feed, confirm at the switchgear that generators are running within the first minute of UPS autonomyUptime OSLesson #4
- Authorised electrical person If the PLC blocks transfer, start generators or switch to the standby source by the rehearsed manual procedureNFPA 110Correction of errors #9
- Operations lead Restore storage integrity before re-admitting traffic after a hard power lossNIST SP 800-34Lesson #5
Evidence
- Root cause“did not verify both an undervoltage condition and physical breaker position for both utility feeders”
- Sequence of events #3“did not issue a start command to the generator plant”
- Reference #1 · official-postmortem“did not issue a start command to the generator plant”
- Contributing factor #2PLC start logic checked voltage on the line side of the feeder breakers and did not check breaker position, so an open but upstream-energised feeder B read as a healthy source (Google report).
FM-02 The site runs on feed A alone for six days with no proof that generator auto-start works in that line-upUtility line-up during maintenance (feeder B open, 1N posture) 8·5·7 280 160
- Function
- Keep two independent utility paths to the critical load, or compensate when one is out
- Effect
- A single external utility fault becomes the trigger for total facility power loss
- Cause
- Feeder B opened for repairs after the 14 Oct load test; the reduced posture was not treated as a configuration needing its own transfer test
- Prevention in place
- 2N utility design; standby utility connection for manual transfer
- Detection in place
- None recorded that tested the generator start in the 1N posture
- S 8
- On its own the posture removes one utility path; combined with the PLC defect it led to a zone-wide outage. Scored 8 so the same outage is not counted at full weight twice.
- O 5
- Maintenance postures with one feeder out are routine in a facility's life: 'occasional'.
- D 7
- Nothing recorded checked the posture against the start logic; the gap was found by the outage.
Corrective action
- Freeze planned maintenance at similar-topology sites and add elevated approval for non-standard configuration changes (Google, completed) Correction of errors #12
- Restore normal A and B line-up under a controlled method of procedure (Google, committed) Correction of errors #3
After action: S8 · O4 · D5 → RPN 160. The freeze and the approval step are complete, so reduced postures are now reviewed before use. They do not remove the need for maintenance, so occurrence only drops one step.
Who acts — playbook
- Operations lead Treat every reduced utility posture as a change: review it and test the automatic transfer in that line-up before leaving the site in itChange managementCorrection of errors #12
- Authorised electrical person While one feeder is out, watch the remaining feed and generator readiness continuously and alarm on any deviationUptime OSContributing factor #1
- Utility / grid operator Coordinate switching to the standby source with the site when the active feed failsNFPA 110Correction of errors #3
- Authorised electrical person Return to the full A and B line-up under a written method of procedure, then repeat the generator transfer testEN 50110-1Correction of errors #5
Evidence
- Sequence of events #1“temporary single-feed (1N) bridged maintenance posture”
- Contributing factor #1Single-feed maintenance posture: after issues found in the 14 Oct 2026 quarterly generator load test, feeder B's breaker was opened for repairs, so feed A carried the whole critical load for six days (Google report).
- Metric #10Days in single-feed posture before the event: 6 (feeder B opened after the 14 Oct load test; outage 20 Oct)
FM-03 About five minutes of battery autonomy runs out before the team can complete a manual transferUPS ride-through and manual fallback 8·4·4 128 96
- Function
- Bridge the critical load until generators or another source take over, and give operators time to act if automation fails
- Effect
- The data halls go dark at 07:00 BST, seven minutes after the utility loss
- Cause
- Battery autonomy sized for automatic generator start; the remote load transfer was blocked by the same PLC reading
- Prevention in place
- Static UPS with about five minutes of autonomy; standby utility connection
- Detection in place
- The facility team saw the problem and tried a remote transfer within the window
- S 8
- Losing the bridge is what turns a control fault into a full outage; scored 8 to avoid double-counting FM-01's outage.
- O 4
- It only matters when automation has already failed: 'infrequent'.
- D 4
- The team knew within the window and acted; the failure was time, not awareness.
Corrective action
- Emergency procedure for loss of the active source, including manual steps within the UPS runtime (Google, completed) Correction of errors #9
- Procedure practised twice per shift (Google, completed) Correction of errors #10
After action: S8 · O3 · D4 → RPN 96. A rehearsed manual procedure makes it more likely the team finishes inside the window. Battery autonomy itself is unchanged, so the improvement rests on practice, not on more time.
Who acts — playbook
- First responder Start the battery-time clock the moment the UPS goes on battery and call the manual procedure at a set thresholdUptime OSCorrection of errors #10
- Authorised electrical person Execute the rehearsed transfer to the standby source within the UPS windowNFPA 110Correction of errors #9
- Incident commander Own the go or no-go on manual switching so the team does not wait on remote commandsNIMS / ICSLesson #4
- Service recovery lead Hold services back until storage integrity is confirmed after the hard power lossNIST SP 800-34Lesson #5
On the record at this failure
Evidence
- Metric #1UPS autonomy (rated): about 5 minutes
- Sequence of events #5“attempted to execute a remote load transfer via the PLC”
- Contributing factor #4UPS autonomy of about five minutes left no time for manual recovery once the PLC blocked the remote load transfer (Google report).
FM-05 Failover is limited by capacity in surviving zones and slow storage recovery; regional services see queueing and 500/503 errorsZonal failover and storage recovery 7·5·3 105 84
- Function
- Move customer workloads to surviving zones and bring storage back without data loss
- Effect
- Recovery takes more than six hours after about 80 minutes without power; regional degradation beyond the dark zone
- Cause
- Capacity constraints, Regional Persistent Disk recovery, a BigQuery autoscaling dependency, and unclean storage shutdown
- Prevention in place
- Multi-zone region design; automated failover
- Detection in place
- Automated monitoring and probers alerted engineers at 07:04 BST
- S 7
- Regional degradation and slow recovery across many services, but most impact stayed in one zone: 7.
- O 5
- Any zonal power loss produces this load on the survivors: 'occasional'.
- D 3
- Monitoring alerted within four minutes of impact.
Corrective action
- BigQuery job provisioning no longer depends on autoscaling (Google, done) Correction of errors #16
- Faster Regional Persistent Disk recovery for HA databases (Google, committed) Correction of errors #15
- Expanded platform testing for infrastructure-level events (Google, committed) Correction of errors #14
After action: S7 · O4 · D3 → RPN 84. One named dependency is removed; the storage and testing work is committed but not confirmed, so only a one-step fall in occurrence is claimed.
Who acts — playbook
- Customer Keep cross-zone failover tested with capacity reserved in the other zonesISO 22301Lesson #6
- Operations lead Alert on zone reachability and cross-zone timeout rates together so a zonal loss is declared within minutesSRE incident mgmtLesson #6
- Service recovery lead Route regional services away from the dark zone and protect capacity for active reservationsSRE incident mgmtContributing factor #6
- Service recovery lead Re-admit traffic gradually so backlogs drain without a second surgeSRE incident mgmtLesson #5
Evidence
- Sequence of events #9“intermittent 500 and 503 errors across europe-west2”
- Contributing factor #6Customer failover was limited by capacity constraints in the surviving zones and by difficulty replicating the underlying storage (Google report, Compute Engine section).
- Metric #4Main impact resolved: 6 hours 8 minutes (07:00 → 13:08 BST)
FM-04 Underground cable fault on the utility network outside the facilityExternal utility cable (feed A) 7·5·2 70 —
- Function
- Supply primary utility power to the facility
- Effect
- Loss of the only live utility feed at 06:53 BST
- Cause
- External underground cable fault; mechanism beyond the location not described in the report
- Prevention in place
- 2N utility design (reduced to 1N at the time); standby utility
- Detection in place
- Immediate loss of supply
- S 7
- On a healthy 2N site this would be a non-event; here it removed the last feed. Scored 7 because the site-level consequence is counted in FM-01 to FM-03.
- O 5
- Utility cable faults are a normal occurrence over a facility's life: 'occasional'.
- D 2
- Loss of supply is seen at once by the electrical system.
Corrective action
- Utility locates the cable fault (completed) and repairs feed A (committed) Correction of errors #2
Who acts — playbook
- Utility / grid operator Notify the site of a feed loss and its expected durationNFPA 110Correction of errors #1
- Authorised electrical person Confirm the site has transferred to generators or another source and stays there until the feed is repairedNFPA 110Correction of errors #2
- Communications lead Post a location-specific status update as soon as a facility-level event is confirmedSRE incident mgmtCorrection of errors #13
- Utility / grid operator Repair and test the faulted cable, then restore the feed in coordinated switching with the siteEN 50110-1Correction of errors #2
On the record at this failure
Evidence
- Sequence of events #2“caused by an underground cable fault on the utility network outside the facility”
- Root cause“external underground cable fault”
Scoring rubric and method
Scales adapted from IEC 60812:2018 and AIAG-VDA. RPN = S × O × D. High: S ≥ 9 with O ≥ 4 or D ≥ 7, or RPN ≥ 300. Medium: RPN ≥ 120 or S ≥ 7. Severity overrides the product: 9 × 2 × 9 = 162 would otherwise hide a region-wide outage nothing could catch. Quotes are checked verbatim against this dossier; a revised score needs a published action. RZ analyst assessment, not an operator document.
Severity
| 10 | Hazard to people, or loss of the facility / several regions |
| 9 | Region-wide or provider-wide outage of a foundational service, no workaround |
| 8 | Full outage of a major service for hours |
| 7 | Major degradation of a major service |
| 6 | Partial outage confined to one zone or one service |
| 5 | Customer-visible degradation |
| 4 | Limited customer impact |
| 3 | Internal impact only |
| 2 | Negligible |
| 1 | No effect |
Occurrence
| 10 | Near certain: the cause is present in normal operation |
| 8 | Frequent: routine work exercises the cause |
| 6 | Occasional: a foreseeable slip or condition, weakly guarded |
| 4 | Infrequent: needs an unusual combination |
| 2 | Remote: guarded by design |
| 1 | Eliminated by design |
Detection
| 10 | No control could detect it |
| 9 | Detected only through customer impact |
| 8 | Detected after impact by internal monitoring |
| 6 | Detected at onset, not prevented |
| 4 | Detected before impact with time to act |
| 2 | Automated interlock almost certainly stops it |
| 1 | Certain to be stopped |
Root cause and contributing factors
Full root-cause narrative
Contributing factors by category
- Single-feed maintenance posture: after issues found in the 14 Oct 2026 quarterly generator load test, feeder B's breaker was opened for repairs, so feed A carried the whole critical load for six days (Google report).
- PLC start logic checked voltage on the line side of the feeder breakers and did not check breaker position, so an open but upstream-energised feeder B read as a healthy source (Google report).
- Common-mode redundancy: the active and standby master PLCs ran identical control logic on shared upstream sensors, so both made the same wrong decision (Google report).
- UPS autonomy of about five minutes left no time for manual recovery once the PLC blocked the remote load transfer (Google report).
- Testing gap (analyst inference from the new actions): the record shows no test of generator auto-start in the 1N posture before the site was left in it; Google's actions now require load-transfer tests 'within the backup battery timer'.
- Customer failover was limited by capacity constraints in the surviving zones and by difficulty replicating the underlying storage (Google report, Compute Engine section).
- Unclean power loss to storage forced a long, deliberate integrity recovery before compute could return (Google report).
Analysis
A correct-looking signal at the wrong point
The PLC did exactly what its logic asked. The defect is the measurement point: line-side voltage on a feeder whose breaker is open. In normal 2N operation that reading is harmless; in the maintenance posture it hid the loss of the only live feed. Control logic that infers 'supply healthy' from upstream voltage needs the breaker state in the same decision.
Redundancy that shared one mistake
The site had two utility feeders, a standby utility, a generator bank and two master PLCs. Three of those were unavailable or blind at once: feeder B was open by design, the generators were never asked to start, and both PLCs shared the same logic and sensors. Redundancy counted by box does not equal redundancy against a logic error.
The maintenance window as the real hazard
The trigger was ordinary, a utility cable fault. What made it a full outage was the six-day single-feed posture after a load-test finding. Google's response freezes similar maintenance elsewhere and adds approvals for non-standard configurations, which treats the line-up itself as a change that needs review.
Recovery dominated by storage, not power
Data-hall power was back at 08:20 BST, about 80 minutes after the halls went dark. Majority workload recovery came at 13:08. The gap is storage integrity work after an unclean shutdown and controlled traffic re-admission, a deliberate choice to protect data over speed.
What the record does not say
The report does not name the facility operator, the PLC manufacturer, the generator count or rating, the cost of the outage, or why the 14 Oct load-test issues required opening feeder B. Those gaps are stated here rather than filled in.
Technical deep-dive
Corrective actions and lessons
Correction of errors
| Action | Owner | Status |
|---|---|---|
| Utility provider locates the damaged cable with low-frequency radar testing | Utility provider | Completed 26 Oct 2026 |
| Utility provider repairs the cable and restores primary feed A | Utility provider | Committed, estimated 13 Nov 2026 |
| Transfer the facility back to primary feeds A and B from the standby source under a controlled method of procedure | Google / site operations | Committed, estimated 17 Nov 2026 |
| Full generator load-transfer tests, including PLC automatic generator start within the battery timer, and review of backup procedures | Google / site operations | Completed 20 Oct and 26 Oct 2026 |
| Full generator load-transfer tests with feeds A and B after the utility repair | Google / site operations | Committed, estimated 17 Nov 2026 |
| Reconfigure and validate the PLC on both undervoltage and breaker status | Google with facility and OEM vendors | Completed 26 Oct 2026 |
| Comprehensive PLC code review and resilience review against multiple failure scenarios | Google with facility vendor teams | Committed, estimated 6 Nov 2026 |
| Validate PLC configurations at other sites with similar topologies and PLC manufacturers | Committed, estimated 15 Nov 2026 | |
| Update the emergency operating procedure for unexpected loss of the active utility source: manual feed restore, manual generator restart and manual transfer within the UPS runtime | Google / site operations | Completed 26 Oct 2026 |
| Practise the updated emergency operating procedure twice per shift | On-site facility team | Completed 24 Oct 2026, checked daily by Google DC Operations |
| Make PLC code review part of commissioning and integrated systems testing before Facility Ready, with a second-team validation within a quarter | Committed, estimated 18 Dec 2026 | |
| Freeze planned maintenance at sites with similar topologies and require elevated approval for non-standard configuration changes | Completed 30 Oct 2026 | |
| Automated alert-to-communication for location-impacting incidents | Google Cloud | Committed, no date given |
| Expand platform-wide testing for infrastructure-level events | Google Cloud | Committed, no date given |
| Faster recovery for high-availability database instances on Regional Persistent Disk | Google Cloud (Cloud SQL, storage) | Committed, no date given |
| Remove the autoscaling dependency from BigQuery job provisioning | Google Cloud (BigQuery) | Done, stated as updated in the report |
Lessons learnt
- A start permissive must measure the bus it protects. Voltage on the line side of an open breaker proves the utility is alive, not that the load is fed: interlock voltage with breaker position.
- Duplicated controllers are not diverse controllers. Two PLCs with the same code and the same sensors fail together on a logic error.
- Every maintenance line-up is a new configuration. Before leaving a site in a reduced posture, test the automatic transfer in that exact line-up.
- Five minutes of UPS is a window for automation, not for people. The manual fallback must be rehearsed to fit inside it, or the battery must be sized for it.
- A hard power loss costs far more time in storage integrity recovery than the power outage itself: here about 80 minutes dark, over 6 hours to majority recovery.
- Zonal failover only works if the surviving zones have capacity and the storage layer can actually fail over under load.
Improvements
- Designverify both undervoltage and breaker position for each feeder before deciding a source is healthy (Google completed PLC reconfiguration).
- Designreview PLC code for resilience to multiple simultaneous failures and validate the configuration at similar sites (Google committed).
- Maintenance regime: full generator load-transfer tests that prove automatic start within the battery timer, repeated after the utility line-up is restored (Google completed and committed).
- Maintenance regime: freeze planned maintenance at similar-topology sites and add elevated approval for non-standard configuration changes (Google completed).
- Safety and operations: updated emergency procedure for loss of the active source, practised twice per shift (Google completed).
- ProcessPLC code review inside commissioning and integrated systems testing before Facility Ready, with independent second-team validation (Google committed).
- Analyst recommendation (not in the report): add a diverse, independent loss-of-supply detector on the critical bus that can start generators even if the master PLC logic is wrong.
References and provenance
- official-postmortem Google Cloud Service Health, incident Xs2XTHzAVC9YnafnPyzj, final incident report (4 Nov 2026)“did not issue a start command to the generator plant”https://status.cloud.google.com/incidents/Xs2XTHzAVC9YnafnPyzj