← All incidents
Incident dossier · Rank #37 · magnitude 5.8

AWS EU West (Dublin) 2011: Transformer Loss and a Generator PLC Halt

Amazon Web Services 2011-08-07 3d 10h to substantial restoration Power

Summary

On Sunday 7 August 2011 a utility transformer feeding much of one AWS EU West zone in Dublin failed. A PLC that brings the backup generators onto the bus halted, the UPS drained and the zone went dark. Staff synchronised generators by hand and restored the network by 13:49 PDT, but EBS recovery took until 10 August.

Users affected
Almost all EC2 instances and 58% of EBS volumes in one EU West zone; Single-AZ RDS in that zone; regional EC2 launch errors for over an hour.
Duration
3d 10h — Trigger 10:41 PDT 7 Aug → 98% of recovery snapshots delivered 20:25 PDT 10 Aug (3 d 9 h 44 min)
Financial
Not disclosed; AWS gave a 10-day 100% credit to customers in the zone
Scope
Single Availability Zone, with regional API impact
Site
AWS EU West Availability Zone (facility not named) · Dublin, Ireland, eu-west-1
Services down
Amazon EC2, Amazon EBS, Amazon RDS, EC2 APIs (EU West)

How the defences failed

How the defences failed — AWS5 failure modes in the order the sequence of events first shows them, 0 latent conditions with no moment in the record, ending in the outcome: Zone dark · EBS tail to 10 Aug.ACTIVE — IN THE ORDER THE RECORD SHOWS THEMFM-01 · RPN 189PLC halts parallelingS9 · O3 · D7FM-02 · RPN 72Network stays darkS8 · O3 · D3FM-05 · RPN 90Slow Multi-AZ failoverS6 · O3 · D5FM-03 · RPN 96Regional API overloadS6 · O4 · D4FM-04 · RPN 144EBS recovery tailS8 · O3 · D6OUTCOMEZone dark · EBS tail to 10 AugLEGENDHigh priorityMedium or low priority, no published actionMedium or low priorityNext failure in the record
How the defences failed — AWS5 failure modes in the order the sequence of events first shows them, 0 latent conditions with no moment in the record, ending in the outcome: Zone dark · EBS tail to 10 Aug.ACTIVE — RECORD ORDERFM-01 · RPN 189PLC halts parallelingS9 · O3 · D7FM-02 · RPN 72Network stays darkS8 · O3 · D3FM-05 · RPN 90Slow Multi-AZ failoverS6 · O3 · D5FM-03 · RPN 96Regional API overloadS6 · O4 · D4FM-04 · RPN 144EBS recovery tailS8 · O3 · D6OUTCOMEZone dark · EBS tail to 10 AugLEGENDHigh priorityMedium or low priority, no published actionMedium or low priorityNext failure in the record
Every failure mode of the FMEA below. Active modes run in the order the sequence of events first shows them — record order, not a proof of cause; latent modes were in place before the event. Red outline: high priority. Dashed: no published corrective action.
Magnitude sub-scores (0–10)Magnitude sub-scores (0–10)Users 6Users affected (0–10) — breadth of the user/customer population impacted. — scored 6/10.Financial 5Financial impact (0–10) — direct + consequential cost. — scored 5/10.Duration 8Outage duration (0–10), from the measured duration by fixed bands: <1 h 3 · 1–4 h 4 · 4–12 h 5 · 12–24 h 6 · 1–3 d 7 · 3–7 d 8 · 7–30 d 9 · >30 d 10; no customer downtime 1. — scored 8/10.Blast 5Blast radius (0–10) — how wide the fault propagated across systems/regions. — scored 5/10.
Magnitude 5.8 = blast 5×0.35 + users 6×0.25 + financial 5×0.20 + duration 8×0.20 (sub-scores 0–10 · weighted composite)

One zone plus regional API impact. Duration (8): about 3 days 10 hours from trigger to 98% of recovery snapshots, inside the 3–7 d band; most instances were back the same day.

All 8 impact metrics
Failed utility transformer110 kV, 10 MW
EBS volumes in the zone that lost power58%
Trigger to first generators online1 hour 13 minutes (10:41 → 11:54 PDT)
Trigger to EC2 APIs recovered in other zones1 hour 19 minutes (12:00 PDT)
Trigger to zone connectivity restored3 hours 8 minutes (13:49 PDT)
RDS DNS connectivity restoredwithin 4 minutes; most failovers within 10 more
Recovery snapshots delivered38% by 06:04 9 Aug · 85% by 02:37 10 Aug · 98% by 20:25 10 Aug PDT
Service credit10 days at 100% of EBS, EC2 and RDS usage in the zone

Sequence of events

  1. TRIGGER The utility's 110 kV 10 MW transformer fails, cutting supply to every customer on it, including a significant portion of one EU West Availability Zone in Dublin.Utility / grid operator
  2. CASCADE One of the PLCs that phase-synchronise the backup generators does not complete connecting a portion of them; AWS believes a large ground fault detected by the PLC stopped it.
  3. CASCADE UPS batteries drain within minutes; power is lost to almost all EC2 instances and 58% of EBS volumes in the zone.
  4. IMPACT EC2 networking gear loses power, cutting the zone off from the internet and the other zones; API calls aimed at the zone fail.
  5. CASCADE A DNS connectivity issue blocks RDS Multi-AZ health checks; DNS returns within 4 minutes and most pairs fail over within 10 more, but a software bug stretches failover for a small subset.
  6. DETECTION Launch delays and API errors are seen in all EU West zones: management servers keep routing to the dead zone and queued launch requests overload them.
  7. MITIGATION Some backup generators are brought online by manually phase-synchronising the power sources; many instances get power but stay unreachable because most network gear is still dark.Authorised electrical person
  8. MITIGATION EC2 launches are disabled in the affected zone and the failed management servers are removed; launch times in the other zones recover.Operations lead
  9. RECOVERY Enough network devices have power to re-establish connectivity to the zone; many instances and volumes become accessible.
  10. MITIGATION AWS posts frequent Service Health Dashboard updates and staffs up its Support team for forum and Premium Support contacts.Communications lead
  11. CASCADE Re-mirroring of EBS volumes exhausts the zone's spare capacity; many volumes stay stuck waiting for a new replica.
  12. RECOVERY AWS brings in additional labour and trucks servers in from another zone to add EBS capacity; night-time logistics add delay.Service recovery lead
  13. CASCADE Volumes whose every replica lost power are treated as possibly inconsistent and must be rebuilt as recovery snapshots through S3, a slow process.
  14. IMPACT Almost all Single-AZ RDS databases in the zone are unavailable; customers without automated backups cannot do a point-in-time restore.
  15. RECOVERY About 38% of recovery snapshots for possibly inconsistent volumes are delivered.
  16. RECOVERY 85% of recovery snapshots are delivered.
  17. RESTORED Recovery snapshots are 98% complete; the remaining few need manual attention.

Response by role

6 roles/5 recorded actions/21 playbook actions across 5 failure modes/no recorded action: Vendor / upstream provider

What each role did

Roles the sequence of events shows acting; every entry quotes its source line. Select a time to jump to it.

Role
Detect
Contain
Recover
Utility / grid operatorThe utility (ESB Networks per DCK), not named in the AWS summary
no record
no record
Authorised electrical personAWS on-site staff
no record
no record
Operations leadAWS EC2 operations
no record
no record
Service recovery leadAWS EBS and RDS teams
no record
no record
Communications leadAWS Service Health Dashboard and Support
no record
no record

Role by role

Recorded actions / playbook actions per role. A role with 0 recorded actions does not appear in the sources.

The utility (ESB Networks per DCK), not named in the AWS summary — External owner of the supply: switching at the substation, load shedding, restoration.

On the record

  1. Lost the transformer that fed much of the zoneThe utility's 110 kV 10 MW transformer fails

Playbook analyst guidance by failure mode, not a record of what happened

AWS on-site staff — Switching, isolation and lock-out of power sources, and safe re-energisation.

On the record

  1. Synchronised generators by handmanually phase-synchronising the power sources

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-01Test generator paralleling with the primary controller failed, on a scheduleNFPA 110Correction of errors #1
  • FM-02Give network gear its own protected supply and first place in restorationUptime OSImprovement #6
Detect
  • FM-01Alarm when generators run but their breakers stay openNFPA 110Contributing factor #2
Contain
  • FM-01Synchronise generators by hand onto the bus using a drilled procedureNFPA 70ECorrection of errors #7
  • FM-02Switch restored generator capacity to network gear before computeUptime OSLesson #2

AWS EC2 operations — Technical lead who diagnoses and drives the fix; the subject-matter expert at the keyboard or the switchboard.

On the record

  1. Disabled launches in the zone and removed failed management serversEC2 launches are disabled in the affected zone

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-03Fail requests for an unreachable zone at once instead of queuing themSRE incident mgmtCorrection of errors #2
Detect
  • FM-04Alert when spare capacity falls below what pending re-mirrors needSRE incident mgmtContributing factor #6
  • FM-03Alert on per-zone API error rate and queue depthSRE incident mgmtContributing factor #5
  • FM-05Alert on any Multi-AZ pair whose failover passes a few minutesSRE incident mgmtContributing factor #8
  • FM-02Track which network devices have power while generators come backSRE incident mgmtContributing factor #4
Recover
  • FM-01Restore network gear first so powered instances can be reachedUptime OSLesson #2

AWS EBS and RDS teams — Restores customer service: failover, workload moves, capacity, backlog drain.

On the record

  1. Added EBS capacity with servers from another zonetrucks servers in from another zone

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-04Size re-mirroring spare for a full zone loss, or recover volumes in placeNIST SP 800-34Correction of errors #4
  • FM-05Remove DNS from the failover health-check pathSRE incident mgmtCorrection of errors #5
Contain
  • FM-04Bring in spare servers from other zones as soon as the shortfall showsISO 22301Correction of errors #9
  • FM-03Disable launches in the failed zone and drain its management hostsSRE incident mgmtCorrection of errors #8
  • FM-05Decide promotion by hand for pairs the automation cannot settleITIL 4Correction of errors #5
Recover
  • FM-02Bring instances back once the network path is verifiedSRE incident mgmtLesson #2

AWS Service Health Dashboard and Support — Status page, customer notices, regulators and press; one voice, timed updates.

On the record

  1. Updated the dashboard often and staffed up SupportAWS posts frequent Service Health Dashboard updates

Playbook analyst guidance by failure mode, not a record of what happened

Recover
  • FM-04Give each customer the state of each volume and how to use its recovery snapshotITIL 4Correction of errors #6
  • FM-03Tell customers healthy zones are open for launchesITIL 4Lesson #6
  • FM-05Point Single-AZ customers to point-in-time restore from backupsITIL 4Lesson #6

The PLC supplier, not named — Third party whose product, service or network sits in the failure path.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Recover
  • FM-01Analyse the PLC with the supplier before returning it to automatic dutyUptime OSCorrection of errors #1

Failure mode & effects analysis (FMEA)

The zone's utility-to-generator transfer (paralleling PLC, UPS ride-through, network gear power) and the AWS recovery path (EC2 regional API, EBS re-mirroring and recovery snapshots, RDS Multi-AZ failover), from AWS's summary.

5 failure modes/1 high priority/4 of 5 with a published action/total RPN 591 → 408 (−31%)

RPN = S × O × D, worst first. Thin bar: after the published action.
FM-01189 → 108
FM-04144 → 126
FM-0396 → 54
FM-0590 → 48
FM-02no published action72
Severity × occurrence. Lines bound the medium and high zones.
1122334455667788991010Occurrence →Severity →FM-01 The PLC does not complete connecting a portion of the generators (S9 O3 D7)01FM-02 Network gear loses power with the servers and comes back two hours after the first generators (S8 O3 D3); FM-04 Spare capacity runs out during re-mirroring, and volumes that lost every replica need slow recovery snapshots via S3 (S8 O3 D6)02, 04FM-05 A DNS issue blocks the health check, and a software bug stretches failover for some pairs (S6 O3 D5)05FM-03 Management servers keep routing to the dead zone and queue launches for it, overloading the region (S6 O4 D4)03
Caught only after impactD ≥ 8
0 of 5
Actions that cut occurrenceO lowered
3
Actions that cut detectionD lowered
3
Actions that cut severityS lowered
1
FM-01 The PLC does not complete connecting a portion of the generatorsGenerator paralleling PLC 9·3·7 189 108
Function
Synchronise generator phase and close the generators onto the bus after a utility loss
Effect
Too little generation; UPS drains; most of the zone loses power
Cause
A large ground fault detected by the PLC, as AWS believes; supplier analysis pending
Prevention in place
Automatic paralleling with UPS ride-through
Detection in place
None before the event
S 9
It took almost all instances in a zone offline: 9.
O 3
A controller halting at the moment of demand is uncommon: 'remote to infrequent'.
D 7
No recorded test failed the controller with live generators.

Corrective action

  • Correct PLC isolation and add a cold isolated backup PLC (AWS, committed) Correction of errors #1

After action: S9 · O2 · D6 → RPN 108. A backup PLC removes the single point of failure if it works; AWS has not reported deployment.

Who acts — playbook

Prevent
  • Authorised electrical person Test generator paralleling with the primary controller failed, on a scheduleNFPA 110Correction of errors #1
Detect
  • Authorised electrical person Alarm when generators run but their breakers stay openNFPA 110Contributing factor #2
Contain
  • Authorised electrical person Synchronise generators by hand onto the bus using a drilled procedureNFPA 70ECorrection of errors #7
Recover
  • Vendor / upstream provider Analyse the PLC with the supplier before returning it to automatic dutyUptime OSCorrection of errors #1
  • Operations lead Restore network gear first so powered instances can be reachedUptime OSLesson #2

Evidence

  • Sequence of events #2“does not complete connecting a portion of them”
  • Contributing factor #2A generator-synchronising PLC did not complete connecting part of the generators, believed to be due to a large ground fault (AWS summary).
  • Reference #1 · official-postmortem“did not complete the connection of a portion of the generators”
FM-04 Spare capacity runs out during re-mirroring, and volumes that lost every replica need slow recovery snapshots via S3EBS re-mirroring and consistency recovery 8·3·6 144 126
Function
Restore every volume quickly and safely after a power loss
Effect
Some customers wait until 10 August for their volumes
Cause
Recovery capacity and path sized for routine failures, not a zone-wide loss
Prevention in place
Replication across nodes plus spare capacity
Detection in place
Seen during recovery
S 8
Single-zone customers waited up to three days, with no workaround: 8.
O 3
Needs a zone-wide power loss: 'remote to infrequent'.
D 6
The capacity gap appeared only in the event.

Corrective action

  • Recover volumes in place on the EBS servers (AWS, committed) Correction of errors #4

After action: S7 · O3 · D6 → RPN 126. In-place recovery removes the S3 copy and the capacity dependency, which shortens the tail; it is committed but not reported complete.

Who acts — playbook

Prevent
  • Service recovery lead Size re-mirroring spare for a full zone loss, or recover volumes in placeNIST SP 800-34Correction of errors #4
Detect
  • Operations lead Alert when spare capacity falls below what pending re-mirrors needSRE incident mgmtContributing factor #6
Contain
  • Service recovery lead Bring in spare servers from other zones as soon as the shortfall showsISO 22301Correction of errors #9
Recover
  • Communications lead Give each customer the state of each volume and how to use its recovery snapshotITIL 4Correction of errors #6

Evidence

  • Sequence of events #11“exhausts the zone's spare capacity”
  • Sequence of events #17“98% complete”
  • Contributing factor #6Spare EBS capacity was too small for re-mirroring at this scale, and night-time logistics delayed extra servers (AWS summary).
  • Contributing factor #7Volumes that lost every replica needed recovery snapshots through S3, a slow process for large volumes (AWS summary).
FM-03 Management servers keep routing to the dead zone and queue launches for it, overloading the regionEC2 regional management API 6·4·4 96 54
Function
Serve launches in healthy zones while one zone is down
Effect
Launch delays and API errors in every EU West zone until 12:00
Cause
No fast removal of failed management hosts; requests queued instead of failed
Prevention in place
Management servers in every zone
Detection in place
Seen at 11:05 as regional launch delays
S 6
It blocked the workaround (launch elsewhere) for over an hour: 6.
O 4
Any zone failure tests this path: 'infrequent'.
D 4
Errors were visible within 24 minutes; the fix was manual.

Corrective action

  • Faster removal of failed API management hosts (AWS, committed) Correction of errors #2
  • Per-zone isolation of control-plane components (AWS, in progress) Correction of errors #3

After action: S6 · O3 · D3 → RPN 54. Load balancing and isolation target both the routing and the queue; neither is reported complete.

Who acts — playbook

Prevent
  • Operations lead Fail requests for an unreachable zone at once instead of queuing themSRE incident mgmtCorrection of errors #2
Detect
  • Operations lead Alert on per-zone API error rate and queue depthSRE incident mgmtContributing factor #5
Contain
  • Service recovery lead Disable launches in the failed zone and drain its management hostsSRE incident mgmtCorrection of errors #8
Recover
  • Communications lead Tell customers healthy zones are open for launchesITIL 4Lesson #6

Evidence

  • Sequence of events #6“queued launch requests overload them”
  • Contributing factor #5EC2 management servers kept routing to the dead zone and queued launches for it, overloading the regional API (AWS summary).
  • Metric #4Trigger to EC2 APIs recovered in other zones: 1 hour 19 minutes (12:00 PDT)
FM-05 A DNS issue blocks the health check, and a software bug stretches failover for some pairsRDS Multi-AZ failover 6·3·5 90 48
Function
Promote the standby database at once when the primary's zone fails
Effect
A small subset of Multi-AZ databases stays unavailable well beyond the usual minutes
Cause
Health check depends on DNS; failover bug; cautious split-brain handling needs an engineer
Prevention in place
Synchronous standby in another zone
Detection in place
Health checks
S 6
It failed customers who had paid for the multi-zone design: 6.
O 3
Needs the DNS issue plus the bug: 'remote to infrequent'.
D 5
Health checks detect the failure, but could not complete here.

Corrective action

  • DNS-robust health checks, failover bug fix and automatic retry for split-brain checks (AWS, committed) Correction of errors #5

After action: S6 · O2 · D4 → RPN 48. The bug fix and retry logic target the extended failovers directly; completion not reported.

Who acts — playbook

Prevent
  • Service recovery lead Remove DNS from the failover health-check pathSRE incident mgmtCorrection of errors #5
Detect
  • Operations lead Alert on any Multi-AZ pair whose failover passes a few minutesSRE incident mgmtContributing factor #8
Contain
  • Service recovery lead Decide promotion by hand for pairs the automation cannot settleITIL 4Correction of errors #5
Recover
  • Communications lead Point Single-AZ customers to point-in-time restore from backupsITIL 4Lesson #6

Evidence

  • Sequence of events #5“a software bug stretches failover for a small subset”
  • Contributing factor #8A DNS connectivity issue and a software bug delayed failover of some RDS Multi-AZ databases (AWS summary).
  • Metric #6RDS DNS connectivity restored: within 4 minutes; most failovers within 10 more
FM-02 Network gear loses power with the servers and comes back two hours after the first generatorsZone network gear power 8·3·3 72 —
Function
Keep the zone's network reachable through a power event
Effect
Instances that regained power stay unreachable until 13:49
Cause
Network gear shared the failed power path; restoration order not stated
Prevention in place
UPS ride-through only
Detection in place
Immediate: the zone went dark
S 8
It cut the whole zone off from customers and other zones: 8.
O 3
Follows from any full power loss of the zone: 'remote to infrequent'.
D 3
Loss of connectivity is visible at once.

Corrective action

  • None published — residual risk.

Who acts — playbook

Prevent
  • Authorised electrical person Give network gear its own protected supply and first place in restorationUptime OSImprovement #6
Detect
  • Operations lead Track which network devices have power while generators come backSRE incident mgmtContributing factor #4
Contain
  • Authorised electrical person Switch restored generator capacity to network gear before computeUptime OSLesson #2
Recover
  • Service recovery lead Bring instances back once the network path is verifiedSRE incident mgmtLesson #2

On the record at this failure

Evidence

  • Sequence of events #4“EC2 networking gear loses power”
  • Sequence of events #7“most network gear is still dark”
  • Contributing factor #4The zone's network gear lost power too, so instances that regained power stayed unreachable until 13:49 (AWS summary).
Scoring rubric and method

Scales adapted from IEC 60812:2018 and AIAG-VDA. RPN = S × O × D. High: S ≥ 9 with O ≥ 4 or D ≥ 7, or RPN ≥ 300. Medium: RPN ≥ 120 or S ≥ 7. Severity overrides the product: 9 × 2 × 9 = 162 would otherwise hide a region-wide outage nothing could catch. Quotes are checked verbatim against this dossier; a revised score needs a published action. RZ analyst assessment, not an operator document.

Severity

10Hazard to people, or loss of the facility / several regions
9Region-wide or provider-wide outage of a foundational service, no workaround
8Full outage of a major service for hours
7Major degradation of a major service
6Partial outage confined to one zone or one service
5Customer-visible degradation
4Limited customer impact
3Internal impact only
2Negligible
1No effect

Occurrence

10Near certain: the cause is present in normal operation
8Frequent: routine work exercises the cause
6Occasional: a foreseeable slip or condition, weakly guarded
4Infrequent: needs an unusual combination
2Remote: guarded by design
1Eliminated by design

Detection

10No control could detect it
9Detected only through customer impact
8Detected after impact by internal monitoring
6Detected at onset, not prevented
4Detected before impact with time to act
2Automated interlock almost certainly stops it
1Certain to be stopped

Root cause and contributing factors

TRIGGER: at 10:41 PDT on Sunday 7 August 2011 the utility's 110 kV 10 MW transformer serving a large part of one AWS EU West Availability Zone in Dublin failed. The utility first blamed lightning and later withdrew that; the cause of the transformer failure is not given. POWER CHAIN: the generators started, but one of the PLCs that synchronise their phase before closing them onto the bus did not complete the connection of a portion of them.
Full root-cause narrative
AWS believes a large ground fault detected by the PLC made it stop. With no utility and too few generators online, the UPS batteries drained and almost all EC2 instances and 58% of EBS volumes in the zone lost power, together with the network gear that linked the zone to the internet and the other zones. Staff synchronised generators by hand from 11:54; network connectivity was back at 13:49. RECOVERY CHAIN: the regional EC2 APIs suffered because management servers kept routing to the dead zone and queued launches for it. EBS re-mirroring exhausted spare capacity, so servers were trucked in at night. Volumes that lost every replica had to be rebuilt as recovery snapshots through S3, which took until 10 August. LATENT ROOT: a single control device stood between a working generator fleet and the load, and the storage recovery design assumed far fewer simultaneous failures than a full zone power loss produces.

Contributing factors by category

Contributing factors by category — AWSEquipment: PLC halts paralleling; UPS drains fast. Design: Network gear dark; API routes to dead zone; RDS failover bug. Process: Spare capacity short; Snapshot recovery slow. External: Utility transformer fails. Effect: EU West zone dark for days.EU West zone dark for daysDesignNetwork gear darkAPI routes to dead zoneRDS failover bugProcessSpare capacity shortSnapshot recovery slowEquipmentPLC halts parallelingUPS drains fastExternalUtility transformer fails
Each short label stands for a contributing factor or failure mode recorded in this dossier; the full sentences are listed below.
  • The utility's 110 kV 10 MW transformer failed; the utility first cited lightning, then said it was not lightning (AWS summary; DCK).
  • A generator-synchronising PLC did not complete connecting part of the generators, believed to be due to a large ground fault (AWS summary).
  • UPS batteries gave only a short ride-through and drained before generators could be synchronised by hand (AWS summary).
  • The zone's network gear lost power too, so instances that regained power stayed unreachable until 13:49 (AWS summary).
  • EC2 management servers kept routing to the dead zone and queued launches for it, overloading the regional API (AWS summary).
  • Spare EBS capacity was too small for re-mirroring at this scale, and night-time logistics delayed extra servers (AWS summary).
  • Volumes that lost every replica needed recovery snapshots through S3, a slow process for large volumes (AWS summary).
  • A DNS connectivity issue and a software bug delayed failover of some RDS Multi-AZ databases (AWS summary).

Analysis

One controller between the generators and the load

The generators started; the PLC that brings them onto the bus did not finish. That turned a routine utility loss into a zone outage. AWS's answer, a cold isolated backup PLC, accepts that the controller is itself a single point of failure.

Power returned before service did

Generators were online at 11:54 but most network gear stayed dark until 13:49, so powered instances could not be reached. Restoration order matters as much as restoration.

A zone failure that leaked into the region

Management servers in healthy zones kept sending and queuing work for the dead zone, so launches slowed across EU West until AWS removed the failed servers at 12:00.

The three-day tail

EBS spare capacity ran out during re-mirroring, and volumes that lost all replicas had to be rebuilt via S3. Recovery snapshots reached 98% only on the evening of 10 August.

A second, unrelated failure

In the same week an EBS snapshot-cleanup bug deleted blocks still referenced by some snapshots. AWS paused that recovery to fight the power event, then finished it on 8 August.

Dating the event

The summary says only 'August 7th' and 'Sunday'. The AWS summaries index lists it under 2014, but 7 August was a Sunday in 2011, not 2014, and Data Center Knowledge reported the outage on 7 August 2011.

Technical deep-dive
Paralleling switchgear lets several generators share a bus only once their voltage, frequency and phase match; a PLC decides when to close each breaker. If that PLC halts, perhaps on a ground-fault input as AWS believes, healthy generators run with nowhere to deliver power. Manual synchronisation works but takes time the UPS batteries do not have. EBS replicates each volume across nodes. When some replicas vanish the survivors block writes until they re-mirror onto spare capacity; a zone-wide event uses up the spare. When all replicas lose power at once, consistency of recent writes cannot be proven, so AWS rebuilt those volumes as recovery snapshots via S3 rather than risk silent corruption. Its fix was to recover volumes in place on the servers. Separately, an EBS snapshot-cleanup bug, unrelated to the power event, had deleted blocks still referenced by some customer snapshots on 5 August; AWS rebuilt those by 16:19 PDT on 8 August.

Corrective actions and lessons

Correction of errors

ActionOwnerStatus
Correct the isolation of the primary PLC and deploy a cold, environmentally isolated backup PLC with vendorsAWSCommitted, 'as rapidly as possible' (completion not reported)
Better load balancing to take failed API management hosts out of service quicklyAWSCommitted (completion not reported)
Further isolate EC2 control-plane components per Availability ZoneAWSIn progress; several more months at the time of the summary
Recover EBS volumes directly on the servers after power returns instead of via S3 snapshotsAWSCommitted (completion not reported)
RDS: health checks robust to DNS issues, fix the failover bug, and let the healthy member retry instead of waiting for an engineerAWSCommitted (completion not reported)
Communication: staff Support faster, expose per-resource impairment through the APIs, clearer recovery-snapshot instructionsAWSCommitted; impairment tools expected within months
Manual phase synchronisation of backup generatorsAWS on-site staffDone during the event, from 11:54 PDT
Disable launches in the affected zone and remove the failed management serversAWSDone during the event, 12:00 PDT
Add EBS capacity with extra labour and servers trucked from another zoneAWSDone during the event
Snapshot cleanup: alarm on unusual findings and a longer recoverable holding state before deletionAWSChanges made per the summary

Lessons learnt

  • A generator fleet is only as available as the controller that parallels it. A single PLC must not be able to keep healthy generators off the bus.
  • Network gear needs power as surely as servers: restored instances were useless for two hours while the network stayed dark.
  • Regional control planes must stop routing to a failed zone at once; queuing work for it spreads the failure to every zone.
  • Recovery capacity must be sized for the zone-wide case, not for routine node failures.
  • Being conservative about data consistency was right, but the slow recovery path turned a three-hour power event into three days for some customers.
  • Customers running independently in several zones saw no interruption.

Improvements

  • Power: correct PLC isolation and add a cold, isolated backup PLC (AWS committed).
  • Control plane: faster removal of failed API hosts and per-zone isolation (AWS committed / in progress).
  • Storage: recover EBS volumes in place after power returns (AWS committed).
  • Database: RDS Multi-AZ health checks and edge-case handling (AWS committed).
  • Communication: faster Support staffing and per-resource impairment visibility (AWS committed).
  • Analyst recommendation (not in the summary): test generator paralleling with the PLC failed, and give network gear its own protected supply priority.

References and provenance

Quotes are short, attributed, and for provenance only; the analysis is original. Last verified 2026-11-11.