Incident dossier · Rank #45 · magnitude 4.6

Digital Realty Singapore Lithium-Ion UPS Fire (2024)

Digital Realty 2024-09-10 restoration time not established FirePower

Summary

A lithium-ion UPS battery fire at a Singapore data center forced an emergency power shutdown, disrupting customers including Alibaba and Lazada — another instance of Li-ion UPS risk in modern facilities.

Users affected
Cloud/e-commerce customers incl. Alibaba/Lazada in the region
Duration
Alarm morning 10 Sep, AZ-C offline ~01:46 11 Sep; no restoration time in dossier.
Financial
Not published
Scope
Li-ion UPS fire, emergency power-off
Site
Digital Realty Singapore data center · Singapore, Singapore
Services down
Alibaba/Lazada regional services (reported), Colocation customers

How the defences failed

How the defences failed — Digital Realty5 failure modes in the order the sequence of events first shows them, 1 latent conditions with no moment in the record, ending in the outcome: Alibaba AZ-C offline · 2-day fire.LATENT — IN PLACE BEFORE THE EVENTFM-06 · RPN 216Cause not disclosedS4 · O6 · D9ACTIVE — IN THE ORDER THE RECORD SHOWS THEMFM-01 · RPN 320Battery room electrical faultS10 · O4 · D8FM-02 · RPN 192Water cannot stop runawayS8 · O4 · D6FM-05 · RPN 168One building takes the zoneS7 · O4 · D6FM-04 · RPN 336Operators kept out of buildingS7 · O6 · D8FM-03 · RPN 216Fire water in server hallsS9 · O4 · D6OUTCOMEAlibaba AZ-C offline · 2-day fireLEGENDMedium or low priority, no published actionHigh priorityMedium or low priorityNext failure in the record
How the defences failed — Digital Realty5 failure modes in the order the sequence of events first shows them, 1 latent conditions with no moment in the record, ending in the outcome: Alibaba AZ-C offline · 2-day fire.LATENT — BEFORE THE EVENTFM-06 · RPN 216Cause not disclosedS4 · O6 · D9ACTIVE — RECORD ORDERFM-01 · RPN 320Battery room electrical faultS10 · O4 · D8FM-02 · RPN 192Water cannot stop runawayS8 · O4 · D6FM-05 · RPN 168One building takes the zoneS7 · O4 · D6FM-04 · RPN 336Operators kept out of buildingS7 · O6 · D8FM-03 · RPN 216Fire water in server hallsS9 · O4 · D6OUTCOMEAlibaba AZ-C offline · 2-day fireLEGENDMedium or low priority, no published actionHigh priorityMedium or low priorityNext failure in the record
Every failure mode of the FMEA below. Active modes run in the order the sequence of events first shows them — record order, not a proof of cause; latent modes were in place before the event. Red outline: high priority. Dashed: no published corrective action.
Magnitude sub-scores (0–10)Magnitude sub-scores (0–10)Users 5Users affected (0–10) — breadth of the user/customer population impacted. — scored 5/10.Financial 4Financial impact (0–10) — direct + consequential cost. — scored 4/10.Duration 4Outage duration (0–10), from the measured duration by fixed bands: <1 h 3 · 1–4 h 4 · 4–12 h 5 · 12–24 h 6 · 1–3 d 7 · 3–7 d 8 · 7–30 d 9 · >30 d 10; no customer downtime 1. — scored 4/10.Blast 5Blast radius (0–10) — how wide the fault propagated across systems/regions. — scored 5/10.
Magnitude 4.6 = blast 5×0.35 + users 5×0.25 + financial 4×0.20 + duration 4×0.20 (sub-scores 0–10 · weighted composite)

Li-ion UPS fire forced emergency power shutdown, impacting customers incl. Alibaba/Lazada — sub-scores ESTIMATED from public impact reporting, pending deep research.

All 10 impact metrics
Fire date10 Sep 2024 (morning SGT)
Occupants self-evacuated before firefighters arrived~20 people
Injuries0 (all personnel out by ~08:15 SGT)
SCDF water jets deployed4 water jets
Unmanned firefighting robots deployed1 (damping-down phase)
Alarm to emergency power shutdown~18 hours (DCD reconstruction; ~01:46, 11 Sep)
Total operation duration to 'stable'~10 Sep to 12 Sep (~2 days)
Facility~17,000 sqm, 4 stories, launched 2016
Battery-room location vs 2020 SCDF ESS standard3rd-floor mezzanine vs required ground floor
Tenants/services disruptedAlibaba Cloud Singapore AZ-C, Lazada, ByteDance/TikTok

Sequence of events

  1. TRIGGER Electrical fault in a third-floor mezzanine battery room initiates Li-ion thermal runaway at the Digital Realty Digital Loyang data center, Loyang, Singapore. 'Early investigations suggest an electrical issue in one of the battery rooms triggered the blaze.'
  2. DETECTION Building fire-alarm system activates — the first publicly indicated detection event; no discrete smoke/heat-sensor timing is disclosed beyond this alarm.
  3. MITIGATION Facility sprinkler systems activate over the involved battery/power rooms on the third-floor mezzanine.
  4. MITIGATION About 20 occupants self-evacuate the building before firefighters arrive.
  5. MITIGATION SCDF alerted and responds to the Loyang data centre to secure the premises and stabilise the situation.Fire & rescue commander
  6. MITIGATION All on-site personnel evacuated with no injuries; SCDF deploys four water jets to cool and contain the battery fire.Safety officerFire & rescue commander
  7. IMPACT Alibaba Cloud detects network anomalies in Singapore Availability Zone C; Lazada and ByteDance/TikTok begin experiencing service disruption.Customer
  8. CASCADE Alibaba warns of increasing likelihood of a complete network outage in Availability Zone C if battery-room temperatures are not controlled; O&M engineers are unable to enter the building.Communications lead
  9. MITIGATION SCDF firefighting knocks down / contains the blaze after roughly half a day of cooling; operation flagged as prolonged due to battery cooling requirements (exact containment time per DCD reconstruction, not re-verified this pass).
  10. IMPACT Firefighting and sprinkler water accumulates and leaks into server halls; Alibaba reports 'water accumulation and leaks, posing a risk of electrical short circuits.'
  11. CASCADE Emergency power shutdown of the affected building executed to prevent electrical short circuits from standing water — this de-energisation, not flame, takes Alibaba Cloud Availability Zone C fully offline (~01:46 per DCD, not re-verified this pass).
  12. MITIGATION Operation spills into a second day; an unmanned firefighting robot is deployed for damping-down as manual entry remains too hazardous/hot.Fire & rescue commander
  13. RECOVERY SCDF declares the site stable after multi-day cooling and damping-down operations.Fire & rescue commander
  14. RECOVERY BCA assesses the structure: minor plaster delamination, paint peeling and soot only, structural integrity intact; issues closure orders for portions of the third, fourth floors and mezzanine.Authority / investigator
  15. RESTORED Alibaba carefully dries water-exposed hardware to ensure data security; migration and restoration of affected machinery proceeds as planned.Service recovery lead

Response by role

9 roles/9 recorded actions/35 playbook actions across 6 failure modes/no recorded action: First responder, Incident commander, Authorised electrical person

What each role did

Roles the sequence of events shows acting; every entry quotes its source line. Select a time to jump to it.

Role
Detect
Contain
Recover
Fire & rescue commanderSCDF, the Singapore Civil Defence Force
no record
  • Declares the site stable on 12 Sep after multi-day cooling
Safety officerBuilding occupants and site staff who evacuated, about 20 before SCDF arrived
no record
no record
Service recovery leadAlibaba Cloud O&M engineers who dried and restored the wet hardware
no record
no record
Communications leadAlibaba Cloud, which warned of a likely full AZ-C outage
no record
  • Warns of a complete AZ-C outage if battery-room temperatures are not controlled
no record
CustomerAlibaba Cloud AZ-C and its tenants Lazada and ByteDance/TikTok
no record
  • Alibaba Cloud, a tenant, detects network anomalies in AZ-C; Lazada and ByteDance/TikTok begin to see disruption
no record
Authority / investigatorBCA, the Singapore building authority, with SCDF
no record
no record
  • Finds structure intact and issues closure orders for parts of floors 3, 4 and the mezzanine

Role by role

Recorded actions / playbook actions per role. A role with 0 recorded actions does not appear in the sources.

Digital Realty Digital Loyang on-site staff — not named; the alarm is the only detection on record — Meets the first alarm: on-shift technician or security in a facility, on-call engineer in a service.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Detect
  • FM-04Report the point at which O&M staff can no longer enter, so tenants can plan remote shutdownSRE incident mgmt
  • FM-01Treat a BMS fault or battery-room temperature alarm as a call-out; do not wait for the building fire alarmNFPA 855
  • FM-03Walk the server halls under the battery rooms for leaks and report water on the floor at onceITIL 4
  • FM-02Give SCDF the battery chemistry, string layout and room access route on arrivalNFPA 1561

No incident commander is named in the record — Owns every decision until formally relieved: site duty manager on scene, or the declared IC of a service incident.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-04Agree with SCDF in advance a re-entry and safe-shutdown protocol for O&M engineersImprovement #4
Contain
  • FM-01Order evacuation and call SCDF at first sign of runaway, stating Li-ion in a third-floor roomNIMS / ICS
  • FM-03Order the building shutdown when water threatens short circuits, and tell tenants the timeNIMS / ICS
  • FM-06Preserve the battery room as evidence and log who has handled itNIMS / ICS
  • FM-02Agree with SCDF the cooling plan and the water drainage route before jets are committedNIMS / ICS
  • FM-05Fail over traffic out of the zone before the shutdown, not after itSRE incident mgmt

SCDF, the Singapore Civil Defence Force — External incident commander for fire, rescue and hazardous materials; works in unified command with the site.

On the record

  1. Responds to secure the premises and stabilise the situationSCDF alerted and responds to the Loyang data centre
  2. Deploys four water jets to cool and contain the battery fireSCDF deploys four water jets to cool and contain the battery fire
  3. Deploys a robot on the second day because manual entry stays too hotan unmanned firefighting robot is deployed for damping-down
  4. Declares the site stable on 12 Sep after multi-day coolingSCDF declares the site stable

Playbook analyst guidance by failure mode, not a record of what happened

Contain
  • FM-04Escort named O&M engineers to shut down specific racks when the area is safeNFPA 1561
  • FM-02Cool the battery rooms continuously with water jets and a robot, accepting a multi-day operationNFPA 855
Recover
  • FM-02Declare stable only after cooling and damping-down confirm no re-ignitionNFPA 1561

Whoever executed the emergency power shutdown — not named — Switching, isolation and lock-out of power sources, and safe re-energisation.

On the record

No action by this role appears in the sources.

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-01Log BMS faults and inspect battery connections thermally; track state of charge and cell age per stringImprovement #5
Contain
  • FM-01Open the DC isolator of the faulted battery string and keep the other strings separatedNFPA 855
  • FM-03Open the feeders of halls where water is dripping or pooled before the water reaches live equipmentNFPA 70EContributing factor #3
Recover
  • FM-02Keep battery rooms de-energised and under temperature watch until released by SCDFNFPA 855

Building occupants and site staff who evacuated, about 20 before SCDF arrived — Head count, exclusion zones, PPE and the go / no-go for re-entry.

On the record

  1. All on-site personnel are out by about 08:15 SGT, no injuriesAll on-site personnel evacuated with no injuries

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-03Add water-tight bunding and drainage between battery rooms and IT hallsCorrection of errors #2
  • FM-02Fit thermal-runaway detection and gas or aerosol suppression to Li-ion rooms to shorten cooling and cut water volumeNFPA 855Correction of errors #3
Detect
  • FM-06Keep battery-room monitoring and inspection records so a lapse can be confirmed or excludedImprovement #5
Contain
  • FM-01Account for every occupant at the assembly point and report the count to SCDFNIMS / ICS

Alibaba Cloud O&M engineers who dried and restored the wet hardware — Restores customer service: failover, workload moves, capacity, backlog drain.

On the record

  1. Dries wet hardware, then migrates and restores machineryAlibaba carefully dries water-exposed hardware to ensure data security

Playbook analyst guidance by failure mode, not a record of what happened

Detect
  • FM-05Alarm on network anomalies in one AZ and map which tenants depend on itSRE incident mgmt
Contain
  • FM-04Prepare a remote or SCDF-escorted shutdown plan for tenant hardware before access is lostISO 22301
Recover
  • FM-04Re-enter on release and migrate machinery in the order agreed with tenantsISO 22301
  • FM-03Dry, test and re-energise halls one at a time after water is removedNFPA 75
  • FM-06Take the same battery model and string layout out of other sites for inspectionNFPA 855
  • FM-05Bring the zone back on release, in dependency order, and confirm with tenantsITIL 4

Alibaba Cloud, which warned of a likely full AZ-C outage — Status page, customer notices, regulators and press; one voice, timed updates.

On the record

  1. Warns of a complete AZ-C outage if battery-room temperatures are not controlledAlibaba warns of increasing likelihood of a complete network outage

Playbook analyst guidance by failure mode, not a record of what happened

Contain
  • FM-05Warn tenants early that the AZ may go fully offline and say what to moveSRE incident mgmt

Alibaba Cloud AZ-C and its tenants Lazada and ByteDance/TikTok — The tenant or service user: their own redundancy, backups and continuity plan.

On the record

  1. Alibaba Cloud, a tenant, detects network anomalies in AZ-C; Lazada and ByteDance/TikTok begin to see disruptionAlibaba Cloud detects network anomalies in Singapore Availability Zone C

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-05Place replicas in a second availability zone in another buildingImprovement #6
Recover
  • FM-04Dry and verify wet hardware for data security before it returns to serviceNIST SP 800-34Correction of errors #4
  • FM-03Power down wet racks and dry the hardware before migrationNIST SP 800-34Correction of errors #4
  • FM-06Ask the operator for the battery make and chemistry and review it against your riskISO 22301
  • FM-05Shift Lazada and TikTok-style downstream traffic to another AZ until the building is releasedISO 22301

BCA, the Singapore building authority, with SCDF — Regulator, investigator or court that establishes cause and obligations after the event.

On the record

  1. Finds structure intact and issues closure orders for parts of floors 3, 4 and the mezzanineBCA assesses the structure

Playbook analyst guidance by failure mode, not a record of what happened

Prevent
  • FM-06Publish SCDF and operator findings on the fault, battery make, chemistry and ageCorrection of errors #6
Recover
  • FM-01Establish the fault mechanism and battery make, chemistry and age, and publish themCorrection of errors #6

Failure mode & effects analysis (FMEA)

The physical chain at Digital Realty's Digital Loyang facility in Singapore — the lithium-ion battery bank in the third-floor mezzanine battery rooms, the fire alarm and water-based suppression, the separation between battery rooms and the server halls below, the emergency power shutdown, operator re-entry and hardware drying, and the tenant availability zone (Alibaba Cloud Singapore AZ-C) and downstream services that depended on the building. Analysed retrospectively from press reporting only (DCD, Straits Times/SCDF, The Star): there is no official post-mortem, the trigger is described only as 'an electrical issue in one of the battery rooms', and battery make, model, chemistry, age and state of charge are undisclosed. Every facility-side corrective action in this dossier is an analyst recommendation with status 'Open — no public evidence', so no revised score is claimed for any mode: all are shown as residual risk.

6 failure modes/3 high priority/0 of 6 with a published action/total RPN 1448 → 1448 (−0%)

RPN = S × O × D, worst first. Thin bar: after the published action.
FM-04no published action336
FM-01no published action320
FM-03no published action216
FM-06no published action216
FM-02no published action192
FM-05no published action168
Severity × occurrence. Lines bound the medium and high zones.
1122334455667788991010Occurrence →Severity →FM-01 An electrical fault in one battery room initiates lithium-ion thermal runaway (S10 O4 D8)01FM-03 Firefighting and sprinkler water drains from the third-floor battery rooms into the server halls, forcing an emergency power shutdown of the building (S9 O4 D6)03FM-02 Water suppression cools but cannot stop cell-to-cell thermal-runaway propagation, so the fire persists and the operation runs over two days (S8 O4 D6)02FM-05 The availability zone depends on one building, so one battery-room fire takes it offline and the outage reaches downstream services (S7 O4 D6)05FM-04 Fire-safety protocol keeps O&M engineers out of the building, so damage assessment, controlled shutdown and drying of wet hardware are delayed (S7 O6 D8)04FM-06 Only an early finding is public; the fault mechanism and battery details remain undisclosed (S4 O6 D9)06
Caught only after impactD ≥ 8
3 of 6
Actions that cut occurrenceO lowered
0
Actions that cut detectionD lowered
0
Actions that cut severityblast radius unchanged
0
FM-04 Fire-safety protocol keeps O&M engineers out of the building, so damage assessment, controlled shutdown and drying of wet hardware are delayedOperator re-entry and hardware recovery 7·6·8 336 —
Function
Let tenant engineers protect, assess and restore equipment as soon as the fire allows
Effect
Alibaba engineers cannot enter while the battery-room temperature threatens AZ-C; wet hardware has to be dried before migration and restoration, which continues after the site is declared stable on 12 Sep
Cause
No pre-agreed operator re-entry or safe-shutdown protocol with SCDF is recorded
Prevention in place
None recorded
Detection in place
Found during the incident
S 7
This mode sets how long the tenant outage lasts after the fire rather than whether it happens: a major degradation of a major service. Scored below FM-03 so the shutdown is not counted twice.
O 6
Exclusion of operators during active firefighting is the normal protocol, so the condition is present in any fire of this kind and only weakly guarded: 'occasional'.
D 8
The lockout's effect on recovery was learned during the incident, with internal awareness but after impact.

Corrective action

  • Pre-agree an operator re-entry and safe-shutdown protocol with SCDF (analyst recommendation, status not disclosed) Improvement #4
  • Dry, assess and restore water-exposed hardware — in progress for this incident; a recovery step, not a preventive control Correction of errors #4

Who acts — playbook

Prevent
  • Incident commander Agree with SCDF in advance a re-entry and safe-shutdown protocol for O&M engineersImprovement #4
Detect
  • First responder Report the point at which O&M staff can no longer enter, so tenants can plan remote shutdownSRE incident mgmt
Contain
  • Service recovery lead Prepare a remote or SCDF-escorted shutdown plan for tenant hardware before access is lostISO 22301
  • Fire & rescue commander Escort named O&M engineers to shut down specific racks when the area is safeNFPA 1561
Recover
  • Customer Dry and verify wet hardware for data security before it returns to serviceNIST SP 800-34Correction of errors #4
  • Service recovery lead Re-enter on release and migrate machinery in the order agreed with tenantsISO 22301

On the record at this failure

  • Communications lead Warns of a complete AZ-C outage if battery-room temperatures are not controlled
  • Fire & rescue commander Declares the site stable on 12 Sep after multi-day cooling
  • Service recovery lead Dries wet hardware, then migrates and restores machinery

Evidence

  • Sequence of events #82024-09-10 daytime — Alibaba warns of increasing likelihood of a complete network outage in Availability Zone C if battery-room temperatures are not controlled; O&M engineers are unable to enter the building.
  • Contributing factor #4Firefighting-protocol lockout of operators: Alibaba's operation-and-maintenance engineers were unable to enter the building, delaying damage assessment, drying and restoration of water-exposed hardware (DCD).
  • Sequence of events #15post-stabilisation (Sep 2024) — Alibaba carefully dries water-exposed hardware to ensure data security; migration and restoration of affected machinery proceeds as planned.
  • Sequence of events #132024-09-12 — SCDF declares the site stable after multi-day cooling and damping-down operations.
FM-01 An electrical fault in one battery room initiates lithium-ion thermal runawayLi-ion battery bank and battery-room electrical system (third-floor mezzanine) 10·4·8 320 —
Function
Store backup energy for the UPS without an electrical fault developing into a fire
Effect
Battery fire in an occupied building; about 20 occupants self-evacuate and all personnel are out by about 08:15 SGT with no injuries; the fire leads to a multi-day firefighting operation and an emergency power shutdown of the building
Cause
Undisclosed. Press relaying SCDF reports only 'an electrical issue in one of the battery rooms'; whether it was a cell short, a charger/BMS fault or a connection arc is not public, and no maintenance or inspection lapse is identified
Prevention in place
None recorded; the battery make, chemistry, age and any inspection regime are not disclosed
Detection in place
Building fire-alarm activation is the first publicly indicated detection event; no earlier warning of the electrical fault is disclosed
S 10
A fire in an occupied building that also takes the whole facility out of service for days is the rubric's 10, which it reserves for hazard to people or loss of a facility. The evacuation worked and no injuries are recorded, but the hazard was real.
O 4
An electrical fault developing into thermal runaway needs an unusual combination, so 'infrequent'. Held at 4 rather than higher because the dossier identifies no lapse that would make it routine; the cause itself is undisclosed.
D 8
The first disclosed detection is the fire alarm, after the fault had already become a fire, so 'detected after impact by internal monitoring'. Whether any battery monitoring existed is not public.

Corrective action

  • Battery-room electrical-integrity monitoring (BMS fault logging, connection and thermal inspection, state-of-charge and cell-age tracking) — analyst recommendation, status not disclosed Improvement #5
  • Root-cause investigation of the battery-room electrical fault — early investigation only, findings not public Correction of errors #6

Who acts — playbook

Prevent
  • Authorised electrical person Log BMS faults and inspect battery connections thermally; track state of charge and cell age per stringImprovement #5
Detect
  • First responder Treat a BMS fault or battery-room temperature alarm as a call-out; do not wait for the building fire alarmNFPA 855
Contain
  • Authorised electrical person Open the DC isolator of the faulted battery string and keep the other strings separatedNFPA 855
  • Incident commander Order evacuation and call SCDF at first sign of runaway, stating Li-ion in a third-floor roomNIMS / ICS
  • Safety officer Account for every occupant at the assembly point and report the count to SCDFNIMS / ICS
Recover
  • Authority / investigator Establish the fault mechanism and battery make, chemistry and age, and publish themCorrection of errors #6

Evidence

  • Sequence of events #12024-09-10 morning SGT — Electrical fault in a third-floor mezzanine battery room initiates Li-ion thermal runaway at the Digital Realty Digital Loyang data center, Loyang, Singapore. 'Early investigations suggest an electrical issue in one of the battery rooms triggered the blaze.'
  • Reference #1 · press“Early investigations suggest an electrical issue in one of the battery rooms triggered the blaze.”
  • Sequence of events #22024-09-10 morning SGT — Building fire-alarm system activates — the first publicly indicated detection event; no discrete smoke/heat-sensor timing is disclosed beyond this alarm.
  • Metric #2Occupants self-evacuated before firefighters arrived: ~20 people
  • Metric #3Injuries: 0 (all personnel out by ~08:15 SGT)
  • Contributing factor #6No public evidence of a maintenance/inspection/testing lapse: the trigger is described only as 'an electrical issue in one of the battery rooms,' with battery make/model, chemistry, age and state of charge undisclosed — an evidentiary gap rather than a confirmed clean bill (Straits Times/SCDF).
FM-03 Firefighting and sprinkler water drains from the third-floor battery rooms into the server halls, forcing an emergency power shutdown of the buildingSeparation between battery rooms and server halls (siting, bunding, drainage) 9·4·6 216 —
Function
Keep suppression water from a battery-room fire away from energised IT equipment
Effect
Water accumulates and leaks into server rooms with a risk of short circuits; the affected building is de-energised in the early hours of 11 Sep, about 18 hours after the alarm, which takes Alibaba Cloud Singapore AZ-C fully offline
Cause
Battery rooms sited above grade on the third-floor mezzanine within the same structure as the server halls, with no water-tight separation. The 2016 facility predates SCDF's 2020 standard requiring ground-floor ESS rooms, so the siting was grandfathered rather than a breach (Digital Realty's position, per DCD)
Prevention in place
None recorded; no bunding or drainage between battery rooms and IT space is described
Detection in place
Alibaba reported water accumulation and leaks in the server room before the shutdown
S 9
This is the route by which a battery fire became a de-energised building and a full availability-zone outage with downstream tenants: the rubric's 9 for an outage with no workaround inside the facility. Not 10, because FM-01 already carries the facility loss and no hazard to people arises from this step.
O 4
A standing design condition, but it is exercised only when suppression water is discharged in the battery rooms in volume, which needs a fire first: 'infrequent'.
D 6
The water ingress was seen while it happened and there were hours before the shutdown, but nothing could stop the water once it was flowing, so 'detected at onset, not prevented'.

Corrective action

  • Relocate or segregate Li-ion ESS battery rooms to ground-floor, water-contained enclosures per the SCDF 2020 ESS standard — status 'Open — no public completion evidence' Correction of errors #1
  • Install water-tight bunding and drainage between battery rooms and server halls — status 'Open — no public evidence' Correction of errors #2

Who acts — playbook

Prevent
  • Safety officer Add water-tight bunding and drainage between battery rooms and IT hallsCorrection of errors #2
Detect
  • First responder Walk the server halls under the battery rooms for leaks and report water on the floor at onceITIL 4
Contain
  • Authorised electrical person Open the feeders of halls where water is dripping or pooled before the water reaches live equipmentNFPA 70EContributing factor #3
  • Incident commander Order the building shutdown when water threatens short circuits, and tell tenants the timeNIMS / ICS
Recover
  • Service recovery lead Dry, test and re-energise halls one at a time after water is removedNFPA 75
  • Customer Power down wet racks and dry the hardware before migrationNIST SP 800-34Correction of errors #4

Evidence

  • Sequence of events #102024-09-10 overnight to 2024-09-11 — Firefighting and sprinkler water accumulates and leaks into server halls; Alibaba reports 'water accumulation and leaks, posing a risk of electrical short circuits.'
  • Sequence of events #112024-09-11 early hours SGT — Emergency power shutdown of the affected building executed to prevent electrical short circuits from standing water — this de-energisation, not flame, takes Alibaba Cloud Availability Zone C fully offline (~01:46 per DCD, not re-verified this pass).
  • Metric #6Alarm to emergency power shutdown: ~18 hours (DCD reconstruction; ~01:46, 11 Sep)
  • Metric #9Battery-room location vs 2020 SCDF ESS standard: 3rd-floor mezzanine vs required ground floor
  • Contributing factor #1Legacy above-grade battery siting: Li-ion energy-storage rooms were on the third-floor mezzanine, contrary to SCDF's 2020 standard requiring ground-floor placement. Digital Realty states the 2016 facility predated the rule, so it was grandfathered — but the elevated siting is the single largest aggravating design factor (DCD).
  • Contributing factor #3Vertical co-location of burning batteries above live server halls: with no water-tight separation between the third-floor battery rooms and IT space, suppression water accumulated and leaked into server rooms, creating the short-circuit risk that drove the emergency shutdown (DCD; Alibaba via DCD).
  • Technical deep-dive“This de-energisation, not flame, is what took Alibaba Cloud Singapore Availability Zone C fully offline”
FM-06 Only an early finding is public; the fault mechanism and battery details remain undisclosedRoot-cause investigation and public disclosure 4·6·9 216 —
Function
Establish and publish the fault, battery make, chemistry and age so operators of similar battery rooms can act
Effect
Customers and other operators cannot tell whether the ignition cause exists elsewhere; this dossier cannot rule a maintenance lapse in or out
Cause
SCDF / Digital Realty investigation findings not publicly disclosed as of this review
Prevention in place
None recorded
Detection in place
Visible only as the absence of findings
S 4
The missing findings do not stop a service; they limit what others can do to protect themselves: 'limited customer impact'.
O 6
The dossier records only an early investigation with findings not disclosed, a foreseeable condition with nothing requiring publication: 'occasional'.
D 9
Nothing surfaces the gap except its absence, which customers notice only from outside.

Corrective action

  • None published — residual risk.

Who acts — playbook

Prevent
  • Authority / investigator Publish SCDF and operator findings on the fault, battery make, chemistry and ageCorrection of errors #6
Detect
  • Safety officer Keep battery-room monitoring and inspection records so a lapse can be confirmed or excludedImprovement #5
Contain
  • Incident commander Preserve the battery room as evidence and log who has handled itNIMS / ICS
Recover
  • Service recovery lead Take the same battery model and string layout out of other sites for inspectionNFPA 855
  • Customer Ask the operator for the battery make and chemistry and review it against your riskISO 22301

Evidence

  • Correction of errors #6Root-cause investigation of the battery-room electrical fault (make/model/chemistry/age) (Early investigation only — findings not publicly disclosed (Straits Times))
  • Contributing factor #6No public evidence of a maintenance/inspection/testing lapse: the trigger is described only as 'an electrical issue in one of the battery rooms,' with battery make/model, chemistry, age and state of charge undisclosed — an evidentiary gap rather than a confirmed clean bill (Straits Times/SCDF).
  • Root cause“No make/model/chemistry can be attributed without over-claiming.”
FM-02 Water suppression cools but cannot stop cell-to-cell thermal-runaway propagation, so the fire persists and the operation runs over two daysBattery-room fire suppression (facility sprinklers and SCDF water jets) 8·4·6 192 —
Function
Extinguish a battery-room fire quickly and with as little water as possible
Effect
Sprinklers and four SCDF water jets are needed; containment takes about half a day, an unmanned firefighting robot is used for damping-down on the second day, and the site is declared stable only on 12 Sep; the operation produces the water volume that later reaches the server halls
Cause
Water is the only firefighting medium recorded for the battery rooms, and it removes heat without arresting self-sustaining Li-ion propagation; the above-grade siting also complicated firefighter access and cooling
Prevention in place
Facility sprinkler systems over the battery and power rooms
Detection in place
The persistence of the fire was visible to responders from the start of firefighting
S 8
This mode sets the duration and the water load of the event rather than its existence; days of firefighting that keep the facility out of reach is the rubric's 8. Not scored at 10 so the fire is not counted twice at full weight with FM-01.
O 4
It needs a battery-room fire first, which is infrequent; given such a fire, water-only suppression would behave the same way.
D 6
Responders could see at once that water was only cooling the batteries, but nothing in place could prevent the propagation: 'detected at onset, not prevented'.

Corrective action

  • Deploy thermal-runaway-appropriate detection and suppression (cell-level, gas or aerosol) to shorten cooling and cut water volume — status 'Open — no public evidence' Correction of errors #3
  • Supplement or replace water-only suppression in Li-ion battery rooms (analyst recommendation) Improvement #3

Who acts — playbook

Prevent
  • Safety officer Fit thermal-runaway detection and gas or aerosol suppression to Li-ion rooms to shorten cooling and cut water volumeNFPA 855Correction of errors #3
Detect
  • First responder Give SCDF the battery chemistry, string layout and room access route on arrivalNFPA 1561
Contain
  • Fire & rescue commander Cool the battery rooms continuously with water jets and a robot, accepting a multi-day operationNFPA 855
  • Incident commander Agree with SCDF the cooling plan and the water drainage route before jets are committedNIMS / ICS
Recover
  • Fire & rescue commander Declare stable only after cooling and damping-down confirm no re-ignitionNFPA 1561
  • Authorised electrical person Keep battery rooms de-energised and under temperature watch until released by SCDFNFPA 855

On the record at this failure

  • Fire & rescue commander Deploys a robot on the second day because manual entry stays too hot

Evidence

  • Sequence of events #32024-09-10 morning SGT — Facility sprinkler systems activate over the involved battery/power rooms on the third-floor mezzanine.
  • Metric #4SCDF water jets deployed: 4 water jets
  • Sequence of events #122024-09-11 second day — Operation spills into a second day; an unmanned firefighting robot is deployed for damping-down as manual entry remains too hazardous/hot.
  • Metric #7Total operation duration to 'stable': ~10 Sep to 12 Sep (~2 days)
  • Contributing factor #2Water-based suppression against Li-ion thermal runaway: sprinklers plus four SCDF water jets could only cool, not stop, self-sustaining cell-to-cell propagation, forcing a multi-day operation and generating the water volume that later reached the IT halls (Straits Times/SCDF).
  • Technical deep-dive“water is a coolant, not an extinguishant, for Li-ion thermal runaway”
FM-05 The availability zone depends on one building, so one battery-room fire takes it offline and the outage reaches downstream servicesTenant availability-zone isolation (Alibaba Cloud Singapore AZ-C and downstream services) 7·4·6 168 —
Function
Keep a cloud availability zone and the services built on it running through the loss of one building
Effect
Alibaba detects network anomalies in AZ-C on 10 Sep and the zone goes fully offline at the shutdown; Lazada and ByteDance/TikTok are disrupted
Cause
Single-facility concentration: the zone and its downstream tenants had insufficient isolation from a single building event
Prevention in place
None recorded
Detection in place
Alibaba detected network anomalies in AZ-C and warned of a likely complete outage
S 7
One availability zone of one provider is the rubric's 6, raised to 7 because the outage reached Lazada and ByteDance/TikTok as well: major degradation, not a region-wide outage.
O 4
It needs the loss of the building first, which is infrequent; the concentration itself is a standing condition.
D 6
Alibaba saw the network anomalies and warned of a complete outage hours before the shutdown, but Lazada and ByteDance/TikTok were already disrupted on 10 Sep, so 'detected at onset, not prevented'. The dossier does not record whether workloads were moved in that window.

Corrective action

  • Improve tenant availability-zone isolation so a single-building event cannot take an entire zone offline (analyst recommendation, status not disclosed) Improvement #6

Who acts — playbook

Prevent
  • Customer Place replicas in a second availability zone in another buildingImprovement #6
Detect
  • Service recovery lead Alarm on network anomalies in one AZ and map which tenants depend on itSRE incident mgmt
Contain
  • Communications lead Warn tenants early that the AZ may go fully offline and say what to moveSRE incident mgmt
  • Incident commander Fail over traffic out of the zone before the shutdown, not after itSRE incident mgmt
Recover
  • Service recovery lead Bring the zone back on release, in dependency order, and confirm with tenantsITIL 4
  • Customer Shift Lazada and TikTok-style downstream traffic to another AZ until the building is releasedISO 22301

On the record at this failure

  • Customer Alibaba Cloud, a tenant, detects network anomalies in AZ-C; Lazada and ByteDance/TikTok begin to see disruption
  • Communications lead Warns of a complete AZ-C outage if battery-room temperatures are not controlled

Evidence

  • Sequence of events #72024-09-10 daytime — Alibaba Cloud detects network anomalies in Singapore Availability Zone C; Lazada and ByteDance/TikTok begin experiencing service disruption.
  • Sequence of events #82024-09-10 daytime — Alibaba warns of increasing likelihood of a complete network outage in Availability Zone C if battery-room temperatures are not controlled; O&M engineers are unable to enter the building.
  • Metric #10Tenants/services disrupted: Alibaba Cloud Singapore AZ-C, Lazada, ByteDance/TikTok
  • Contributing factor #5Single-facility concentration risk for tenants: Alibaba Cloud Singapore Availability Zone C, and downstream Lazada and ByteDance/TikTok, had insufficient isolation from a single building event, so one battery-room fire produced a multi-tenant regional outage (DCD; The Star).
  • Reference #3 · press“Alibaba Cloud services in Singapore, along with Lazada and ByteDance-owned TikTok, were disrupted”
Scoring rubric and method

Scales adapted from IEC 60812:2018 and AIAG-VDA. RPN = S × O × D. High: S ≥ 9 with O ≥ 4 or D ≥ 7, or RPN ≥ 300. Medium: RPN ≥ 120 or S ≥ 7. Severity overrides the product: 9 × 2 × 9 = 162 would otherwise hide a region-wide outage nothing could catch. Quotes are checked verbatim against this dossier; a revised score needs a published action. RZ analyst assessment, not an operator document.

Severity

10Hazard to people, or loss of the facility / several regions
9Region-wide or provider-wide outage of a foundational service, no workaround
8Full outage of a major service for hours
7Major degradation of a major service
6Partial outage confined to one zone or one service
5Customer-visible degradation
4Limited customer impact
3Internal impact only
2Negligible
1No effect

Occurrence

10Near certain: the cause is present in normal operation
8Frequent: routine work exercises the cause
6Occasional: a foreseeable slip or condition, weakly guarded
4Infrequent: needs an unusual combination
2Remote: guarded by design
1Eliminated by design

Detection

10No control could detect it
9Detected only through customer impact
8Detected after impact by internal monitoring
6Detected at onset, not prevented
4Detected before impact with time to act
2Automated interlock almost certainly stops it
1Certain to be stopped

Root cause and contributing factors

Ignition source: the facility's lithium-ion battery bank serving the UPS/energy-storage backup of Digital Realty's Digital Loyang data center in Loyang, Singapore, housed in battery rooms on the third-floor mezzanine of the four-storey building.
Full root-cause narrative
Press relaying SCDF reported the fire "involved lithium-ion batteries housed in battery rooms on the third floor." Proximate mechanism: thermal runaway initiated by an electrical fault — "Early investigations suggest an electrical issue in one of the battery rooms triggered the blaze" (Straits Times/SCDF). Once initiated, cell-to-cell thermal-runaway propagation — the self-sustaining, re-igniting behaviour characteristic of Li-ion cells — resisted extinguishment and forced prolonged cooling that spilled into a second day. DISCLOSED UNCERTAINTY: The public record does not disclose the battery/UPS make and model, the cell chemistry (NMC vs LFP), cell age, state of charge, or the precise electrical fault (internal cell short vs charger/BMS fault vs connection arc). No make/model/chemistry can be attributed without over-claiming. The specific Digital Realty site code and exact street address are not independently confirmed in this review pass and are therefore not asserted. LATENT ROOT — DESIGN/SITING, NOT A MAINTENANCE VIOLATION: The salient systemic root is battery-room placement. SCDF's 2020 safety standards require Energy Storage Systems (Li-ion battery rooms) to sit on the ground floor, but the failed batteries were on the third-floor mezzanine. Digital Realty's position is that the facility launched in 2016, before the 2020 standard, so the elevated placement predated and was not governed by that rule — a legacy/grandfathered design rather than a rules breach (DCD). This above-grade siting materially worsened the event: it complicated firefighter access and battery cooling, and it placed burning batteries within the same structure as live server halls, so suppression water drained down into the IT space and forced an emergency power shutdown. No public evidence identifies a maintenance, inspection, testing, hot-work, or deferred-work lapse as the ignition cause; the trigger is described only as "an electrical issue in one of the battery rooms." The dominant redundancy/design gap is therefore the co-location of an above-grade Li-ion energy-storage hazard above critical IT load, with water-based suppression as the only viable firefighting medium.

Contributing factors by category

Contributing factors by category — Digital RealtyDesign: Batteries on 3rd floor; Batteries above server halls; One building per zone. Equipment: Battery-room electrical fault; Water cannot stop runaway. Process: Operators locked out; No inspection record. Effect: AZ-C offline after battery fire.AZ-C offline after battery fireDesignBatteries on 3rd floorBatteries above server hallsOne building per zoneProcessOperators locked outNo inspection recordEquipmentBattery-room electrical faultWater cannot stop runaway
Each short label stands for a contributing factor or failure mode recorded in this dossier; the full sentences are listed below.
  • Legacy above-grade battery siting: Li-ion energy-storage rooms were on the third-floor mezzanine, contrary to SCDF's 2020 standard requiring ground-floor placement. Digital Realty states the 2016 facility predated the rule, so it was grandfathered — but the elevated siting is the single largest aggravating design factor (DCD).
  • Water-based suppression against Li-ion thermal runaway: sprinklers plus four SCDF water jets could only cool, not stop, self-sustaining cell-to-cell propagation, forcing a multi-day operation and generating the water volume that later reached the IT halls (Straits Times/SCDF).
  • Vertical co-location of burning batteries above live server halls: with no water-tight separation between the third-floor battery rooms and IT space, suppression water accumulated and leaked into server rooms, creating the short-circuit risk that drove the emergency shutdown (DCD; Alibaba via DCD).
  • Firefighting-protocol lockout of operators: Alibaba's operation-and-maintenance engineers were unable to enter the building, delaying damage assessment, drying and restoration of water-exposed hardware (DCD).
  • Single-facility concentration risk for tenants: Alibaba Cloud Singapore Availability Zone C, and downstream Lazada and ByteDance/TikTok, had insufficient isolation from a single building event, so one battery-room fire produced a multi-tenant regional outage (DCD; The Star).
  • No public evidence of a maintenance/inspection/testing lapse: the trigger is described only as 'an electrical issue in one of the battery rooms,' with battery make/model, chemistry, age and state of charge undisclosed — an evidentiary gap rather than a confirmed clean bill (Straits Times/SCDF).

Analysis

A thermal-runaway fire, but a water-caused outage

The September 2024 fire at Digital Realty's Digital Loyang facility is best understood as two coupled events. The first was a lithium-ion battery fire on the third-floor mezzanine, triggered by an electrical fault and sustained by cell-to-cell thermal runaway that water can cool but not extinguish. The second — and the one that actually caused the customer-visible outage — was hydraulic: accumulated sprinkler and firefighting water draining down into server halls, forcing an emergency power shutdown to avoid short circuits. Flame never breached the IT space or structural integrity; the suppressant did the damage.

Above-grade battery siting as the systemic root

The decisive design condition was that an energy-storage hazard sat above live server halls with no water-tight separation. SCDF's 2020 ESS standard requires Li-ion battery rooms on the ground floor precisely to avoid this geometry; the failed rooms were on the third-floor mezzanine. Gravity did the rest — water migrated down onto energised equipment. Ground-floor siting with bunded, drained containment would have decoupled the battery event from the IT load.

Legacy compliance versus safe design

Digital Realty's stated position is that the facility launched in 2016, before the 2020 standard, so the elevated placement was grandfathered rather than a breach. That is legally coherent but operationally cautionary: the arrangement that was permissible under the older code is exactly the arrangement that turned a contained battery fire into a regional cloud outage. Grandfathered compliance is not evidence of safe design.

The multi-tenant cascade

Because a single building hosted Alibaba Cloud Singapore Availability Zone C, the emergency de-energisation propagated outward — first to Alibaba's own AZ-C, then to downstream tenants Lazada and ByteDance/TikTok. The blast radius demonstrates that logical availability-zone labels do not guarantee physical isolation when redundancy is concentrated in one structure. Recovery was further slowed by fire-safety protocol barring O&M engineers from re-entry until the site was declared stable.

Evidentiary gaps that remain open

The public record does not disclose the battery/UPS make and model, cell chemistry, age, state of charge, or the precise electrical fault. The trigger is described only as 'an electrical issue in one of the battery rooms.' No maintenance, inspection or hot-work lapse is identified — which is an absence of evidence, not a clean bill. A full root cause would require the undisclosed SCDF/Digital Realty investigation findings, which were not public as of this review.

Technical deep-dive
The event is a textbook illustration of why Li-ion energy storage co-located with IT load creates a cascading, water-coupled failure mode rather than a contained electrical fire. On the morning of 10 Sep 2024 the building fire-alarm system triggered — the first publicly indicated detection event; no discrete smoke/heat-sensor timing is disclosed beyond the alarm. Facility sprinklers activated and SCDF deployed four water jets on arrival. Crucially, water is a coolant, not an extinguishant, for Li-ion thermal runaway: it cannot arrest cell-to-cell propagation, only remove heat, so the fire re-asserted itself and the operation became a prolonged cooling exercise — contained the same day but requiring damping-down with an unmanned firefighting robot (conditions too hot/hazardous for manual entry) and not declared stable until 12 Sep. The decisive engineering failure was hydraulic, not thermal. Because the battery rooms sat on the third-floor mezzanine directly within the four-storey structure, accumulated firefighting and sprinkler water migrated downward into server halls. Alibaba reported the server room "started to experience water accumulation and leaks, posing a risk of electrical short circuits." To prevent energised electronics from short-circuiting in standing water, an emergency power shutdown of the affected building was executed in the early hours of 11 Sep — roughly 18 hours after the alarm per DCD's reconstruction of Alibaba's timeline. This de-energisation, not flame, is what took Alibaba Cloud Singapore Availability Zone C fully offline and cascaded to Lazada and ByteDance/TikTok. The fire itself never breached structural integrity: BCA found only minor plaster delamination, paint peeling and soot, and issued closure orders for portions of the third, fourth and mezzanine levels. Recovery was throttled by fire-safety protocol — Alibaba's O&M engineers were barred from re-entering the building — so wet hardware had to be carefully dried before migration/restoration. The lesson embedded in the physics: with an above-grade Li-ion hazard and water-only suppression, the suppressant becomes the primary agent of collateral IT damage.

Corrective actions and lessons

Correction of errors

ActionOwnerStatus
Relocate/segregate Li-ion ESS battery rooms to ground-floor, water-contained enclosures per SCDF 2020 ESS standardDigital Realty (facility engineering)Open — no public completion evidence
Install water-tight bunding/drainage between battery rooms and server halls to prevent suppression-water ingress into IT spaceDigital Realty (design/build)Open — no public evidence
Deploy thermal-runaway-appropriate detection and suppression (cell-level/gas/aerosol) to shorten cooling and cut water volumeDigital Realty with SCDF guidanceOpen — no public evidence
Dry, assess and restore water-exposed hardware to ensure data securityAlibaba Cloud O&MIn progress — migration and restoration reported proceeding as planned (DCD)
Building-integrity assessment and closure orders for affected floorsBCA / SCDFCompleted — structural integrity intact; closure orders issued (BCA/Straits Times)
Root-cause investigation of the battery-room electrical fault (make/model/chemistry/age)SCDF / Digital RealtyEarly investigation only — findings not publicly disclosed (Straits Times)

Lessons learnt

  • Against Li-ion thermal runaway, water suppresses nothing — it only cools; sprinklers and four water jets could not stop cell-to-cell propagation, turning the event into a multi-day cooling operation (Straits Times/SCDF).
  • The suppressant became the primary weapon of collateral damage: firefighting/sprinkler water, not flame, reached the server halls and forced the emergency power shutdown that caused the actual outage (DCD; Alibaba via DCD).
  • Vertical siting of an ESS hazard above IT load converts a contained battery fire into a facility-wide IT event through simple gravity-driven water migration (DCD).
  • Grandfathered/legacy compliance is not the same as safe design: the 2016 above-grade battery rooms were legal because they predated the 2020 ground-floor standard, yet that very placement drove the worst consequences (DCD).
  • Operator lockout under fire-safety protocol lengthens recovery — barring O&M engineers from the building delayed drying and restoration of water-exposed hardware (DCD).
  • Single-building faults still cascade to whole cloud Availability Zones; tenant redundancy that shares one physical facility is insufficient isolation (DCD; The Star).

Improvements

  • DesignRelocate Li-ion energy-storage systems to ground-floor, water-segregated rooms per SCDF's 2020 ESS standard so burning batteries are not sited above live server halls and suppression water cannot drain into IT space (basis: DCD siting finding).
  • DesignIntroduce water-tight bunding, drainage and floor-slab containment between battery rooms and IT halls so sprinkler/firefighting water from an ESS event is captured and drained rather than pooling on energised equipment (basis: Alibaba water-ingress report via DCD).
  • SafetySupplement or replace water-only suppression in Li-ion battery rooms with thermal-runaway-appropriate measures (cell-level detection, gas/aerosol early suppression, dedicated cooling) to shorten the multi-day cooling operation and reduce suppression-water volume (basis: SCDF 'prolonged' cooling requirement, Straits Times).
  • ProcessEstablish a pre-agreed operator re-entry and safe-shutdown protocol with SCDF so O&M engineers can perform controlled de-energisation and hardware protection earlier, rather than being unable to enter the building during the critical window (basis: DCD).
  • MaintenanceInstitute and document battery-room electrical-integrity monitoring (BMS fault logging, connection/thermal inspection, state-of-charge and cell-age tracking) to close the evidentiary gap around 'an electrical issue' and enable pre-failure detection (basis: undisclosed cause / no public inspection record, Straits Times).
  • DesignImprove tenant availability-zone isolation so a single-building event cannot take an entire cloud Availability Zone (and downstream Lazada/TikTok) offline via one power shutdown (basis: multi-tenant cascade, DCD/The Star).

References and provenance

Quotes are short, attributed, and for provenance only; the analysis is original. Last verified 2026-08-02 (seed — pending deep research).