CAPEX Estimator
Data Center Construction Cost
IT Power Capacity (MW)
Planned IT load capacity in megawatts
Redundancy / Tier Level
Tier I -- Basic (N)
Tier II -- Redundant (N+1)
Tier III -- Concurrent (2N)
Tier IV -- Fault Tolerant (2N+1)
Region
Americas (US Baseline)
EMEA (Europe, Middle East)
APAC (Asia Pacific)
MEA (Middle East / Africa)
Estimated CAPEX Range
$50.5M - $60.1M
Based on 5 MW Tier III in Americas
$10.1M
Cost / MW
$10,100
Cost / kW
$80.8K
Cost / Rack
625
Est. Racks
Cost Breakdown (Midpoint)
Powered by ResistanceZero