DC Solutions · Calculator · Tier

Data center tier classification from power, cooling, network and site

Maps the infrastructure you enter to Uptime Institute Tier I–IV, TIA-942 Ratings 1–4, EN 50600 availability classes and BICSI 002, names the subsystem that limits the result and lists what reaching the next tier takes. Computed in your browser.

model weighted subsystem scores with Tier III / IV floor rules · basis Uptime Institute, TIA-942-B, EN 50600, BICSI 002 · updated 2026-10

DC Solutions → Calculator → Tier

Facility Profile
Type, capacity, and building characteristics
Power Infrastructure
Utility, generators, UPS, and distribution
Cooling Infrastructure
Redundancy, distribution, and cooling type
Network & Connectivity
Entry points, carriers, and meet-me rooms
Physical Security & Fire
Suppression, access control, and monitoring
Regional Compliance
Jurisdiction-specific requirements

Results

score = Σ subsystem score · weight, capped by the Tier III / IV topology rules

Headline

Classification
Tier III
Concurrently Maintainable

Score

Composite score
72
of 100
Grade
B
Confidence
88%
spread of the five subsystem scores
Facility assessed
2,000 kW
Colocation

Framework mapping

Uptime Institute
Tier III
TIA-942-B
Rated 3
EN 50600
VK3
BICSI 002
Class F3

Subsystem scores, 0–100

Power
—
Cooling
—
Network
—
Physical
—
Monitoring
—

Gap to the next tier

Calculating.

Recommendations

Full analysis — regional compliance for 12+ jurisdictions, upgrade cost estimate, Monte Carlo confidence, sensitivity and the PDF report

Full analysis

Regional score
—
Upgrade cost estimate
—
Monte Carlo P50 score
—
Probability of the target tier
—

Uncertainty: computing…

FIG. 1 Subsystem Radar · computed from the inputs above
FIG. 2 Subsystem vs Tier Thresholds · computed from the inputs above
FIG. 3 Monte Carlo Distribution · computed from the inputs above
FIG. 4 Contribution to the composite score, points · the six largest inputs as they stand (an input already at its best option contributes most and has no room left to raise the score)
Cost-to-Upgrade Estimator
Upgrade ActionCost RangeImpact
Regional Compliance

Select a region in the Regional Compliance section to see jurisdiction-specific requirements.

02 / Reference

Method

  • Power0.20 utility + 0.25 generators + 0.20 UPS + 0.10 topology + 0.10 ATS + 0.10 PDU + 0.05 fuel autonomy
  • Cooling0.50 redundancy + 0.30 distribution + 0.20 type
  • Network0.45 entry points + 0.30 carriers + 0.25 meet-me room
  • Physical0.35 fire suppression + 0.35 access control + 0.30 monitoring
  • CompositeΣ subsystem score · weight, regional 50 unless set
  • Floor rulesscore ≥ 75 needs dual feeds, N+1 generators and UPS, dual cooling paths; ≥ 90 needs 2N throughout
  • Tier≥ 90 IV · ≥ 75 III · ≥ 60 II+ · ≥ 45 II · ≥ 25 I+ · else I

Computed against

Uptime Institute Tier StandardANSI/TIA-942-BEN 50600BICSI 002

Read further

Estimates for education and planning, built from public industry benchmarks. Not a basis for investment, procurement or engineering decisions; confirm site-specific figures with a qualified engineer. Runs in your browser; nothing is sent to a server. Independent research; not affiliated with any current or former employer. Privacy · Terms.